Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 86fr3567 <br />FAX: 1303) 832-810b <br />March 25, 2004 <br />CR Evans <br />231 Nyberg Rd. <br />Pueblo, CO. 81006 <br />Re: Technical Review Adequacy Letter, <br />M-2000-041 <br />Dear Mr. Evans: <br />COLORADO <br />DIVISION O F <br />MIN SRALS <br />GEOLOGY <br />REC LAMATION•MINING <br />SAFETT•ECIEN CE <br />Bill Owens <br />Governor <br />Russell George <br />Executive Director <br />Ronald W. Cottony <br />Division Director <br />Natural Resource Trustee <br />Technical Revision Submittal (TR-O1), Evans #2 Pit, <br />The Division completed a technical review of your technical revision submittal regazding the <br />proposed decrease in the amount of disturbed acreage at the referenced mine site. Following aze <br />a few items that need to be addressed: <br />1. You propose to reduce the amount of disturbed acreage to 70 acres. Currently, the <br />operator is allowed to mine a 15-acre tract and disturb an additiona160 acres to backfill <br />the 15-acre excavated hole until such time that all the water rights issues have been <br />resolved (75 acres total). An $838,618 bond is in place to provide the funds to backfill the <br />15-acre tract if the water rights issues aze not resolved. Once the water issues aze resolved, <br />the operator is allowed to excavate the entire 448 acres in 50-acre increments and the <br />bond can be reduced (significantly) to a level sufficient to reclaim a 50-acre pond azea. <br />2. Since you propose to only disturb 70 acres (not 448 acres), you need to submit a map that <br />shows where this acreage is situated. Also, you will need to delineate the proposed 70- <br />acre tract in the field with appropriate boundary mazkers. You will need to provide a <br />detailed narrative explaining how the 70 acres will be disturbed. Remember, currently, <br />only 15 acres can be excavated, the other 60 acres aze needed to provide backfill material <br />to fill in the excavated hole if the water rights issues aze not resolved. If you reduce the <br />total disturbed acreage to 70 acres where will all the material come from in order to <br />adequately backfill the excavated pit? <br />3. You state that the site will be dry mined. After stripping off topsoil and overburden, how <br />much sand and gravel do you anticipate excavating before groundwater is encountered? In <br />order to maintain a dry mine (unless it is dewatered) the operator must remain at least 2 <br />feet above the groundwater table. However, if you do not excavate below the water table <br />how do you propose to achieve final reclamation? Currently, as approved, the site will be <br />reclaimed to a 300-acre recreation lake. The shoreline and buffer azeas aze the only part of <br />the permit that need to be topsoiled and revegetated. The backslopes are to be graded to a <br />3:1 gradient. ff you decide to revise/change the post-mining land use/reclamation plan you <br />must submit a permit amendment (see C.R.S. 34-32.5-112(7)). Of course, if you only <br />intend to reduce the size of the lake, this technical revision will suffice. But, in order to <br />permanently expose groundwater (create alake/pond), all water rights issues must be <br />resolved. <br />Office of Office of Colorado <br />Mined Land Reclamation Active and Inactive Mines fanlnvical Cun,w <br />