Laserfiche WebLink
remediation and to notify DMG if further movement occurred. Please <br />provide the remediation plan and notifications as required. <br />The following is a list of maintenance items noted in this <br />inspection: <br />1. Perform seasonal maintenance of Goat Trail, including removing <br />fallen rock, restoring of ditches, cleaning downdrains and <br />culverts. <br />2. Maintenance of liner and rip rap in outlet channels of West <br />Ridge Hydrologic Reconstruction Area. <br />3. Maintenance of culverts SK-1 and SK-5. <br />4. Repair small rilled areas in West Ridge reclamation. <br />5. Weed control is needed, particularly thistle. Although thistle <br />is prevalent across the site, the following areas have been noted <br />as needing attention: reclaimed road near super curve; all along <br />the corridor of West Ridge Drainage Reconstruction; top of West <br />Ridge reclamation; slope around downdrain #4 in Moffat Area; all <br />areas where sediment has been deposited into native vegetation (see <br />NOV C-97-007.) <br />6. Additional efforts need to be taken if areas that are currently <br />almost barren of vegetation haven't experienced significant plant <br />growth by the appropriate time for seeding. Specifically areas of <br />West Ridge, reclaimed explosives area, and road narrowing areas <br />should be monitored. Mulch is probably appropriate until vegetation <br />is established. <br />