Laserfiche WebLink
• <br />Cheryl Linden -2- September 9, 1994 <br /> for his review prior to the April 1993 inspection. Also, Kerr Coal research <br /> of AFO files indicates record of TR-07 approval 8/17/90. <br />4/01/93 OSM oversight inspection of mine site. OSM inspectors Rathbun and Austin; <br /> DMG inspectors Berry and Price. <br />Summer 1993 OSM Western Service Center conducts technical review of site bacld'ill <br /> vo]umetrics and bonding, as requested by AFO subsequent to 4/01/93 <br /> inspection. <br />Late Summer <br />1993 AFO inspector Austin refuses to send WSC technical reports to DMG. <br />10/29/93 Technical Revision No. 10 (Minor changes to Pit No. 1 fmal topography) - <br /> Approved. Completeness letter to AFO in our file specifically references <br /> change to Pit 1 topography. <br />3/03/94 DMG obtains faxed copies of WSC reports by calling WSC directly. <br />5/12/94 Phase I (bacl~ill and grading) joint OSM/DMG inspection of Marr Mine. <br /> OSM inspectors Austin and Rathbun; DMG inspectors Berry and Price. <br />5/23/94 Receive letter of landowner satisfaction with fmal Pit 1 co~guration from <br /> BLM. <br />5/25/94 Marr receives Federal NOV 94-020-352-003 for failure to achieve AOC on <br /> federal (BLM) portion of Pit 1. <br />6/03/94 DMG receives OSM inspection report, copy of Fedetal NOV, and Ten-Day <br /> Notice X-94-020-352-002 TV, alleging same violation for private portion of <br /> Pit 1. <br />6/13/94 DMG response to AFO, stating belief that violation does not exist. <br />6/20/94 Receive AFO response, stating their belief violation does exist. <br />6/30/94 DMG sends TDN appeal to OSM Washington, D.C. <br />8/22/94 Appeal rejected. <br />9/13/94 AFO will inspect Marr Mine, and probably issue another Federal NOV to <br />Marr for the private portion of Pit 1. <br />nt:~oss~w~ons.c~ <br />