Laserfiche WebLink
04004 <br />Banks and Gesso, LLC <br />Exhibit L -Reclamation Costs <br />The applicant, L.G. Everist, Inc., requests phased bonding for the amendment areas. <br />The existing mining area (Fort Lupton Pit) is currently bonded, and the applicant <br />proposes to bond each new phase prior to disturbance. The Hill-Eber-Oakley phase will <br />likely be mined first, and a slurry wall installed prior to exposing groundwater. This and <br />all additional phases will be bonded prior to their disturbance, via Technical Revisions <br />that address the type of liner to be used (slurry wall or clay liner), the sequence of <br />installing the liner, and the estimated reclamation costs for that phase. <br />Fort Lupton Sand and Gravel Mine - L.G. Everist, Inc. ~ September 20, 2004 <br />Amendment to Permit No M-1999-120 Page 28 <br />