My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE28454
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE28454
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:35:45 PM
Creation date
11/21/2007 11:57:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986079
IBM Index Class Name
Enforcement
Doc Name
NOV M-92-025 & CEASE & DESIST ORDER FINDINGS OF FACT
Violation No.
MV1992025
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~+t, <br />L~~ <br /> <br />h1 I N I NG F'LAN <br /> <br />EXH 1 L~ I -i- D <br /> Mining of the M R G Git will be done ir. five phases. (See <br />® Exhibit C>. The five ^hases range from 13.1 tc. c1.8 acres <br /> ~~f the pr^oper•ty. They will each be stripped and all <br />'~ overb~.rrden stockpiled aloha the property bo~_mdaries, After <br />Phase I is mimed, waste fines and over•b~.irder~ fr•orn s~.~bsec~.rer~t <br /> phases will be used to backfill the North are es~~reiine <br /> pf this area. 'hase i serve as e p are site. <br />® Reclamation ~_ all phases will be done contemporaneously <br /> with the mining. <br /> The entire site has an average depth of 17 feet c,f sand aril <br /> er•avel deposits. Thirteen feet of this lies iri cood <br /> deposits and the r•emair~ir~g 4 feet ar•e sand ar~d clayey sand <br />~~ deposits. There are several areas where clay domes are <br />irit er•s per^sed thro~_rgh the deec~sits. ',Jn er•e cr•act icai, these <br /> domes will be removed and ~_~sed for back.fill with waste sand. <br /> The underlying stratum f~:r this tleposit is a claystone that <br /> is hard to very hard, This claystone is ^ar•t of the Denver <br /> format ior~. <br /> There is a total of 76 acres that will be mined. EstLmated <br />® reserves that are mineable is adproxinrately 2,760,000 toms. <br /> This would arnount to 385,000 tens per year with a 7 year <br /> mine life. The mine life could vary dependir~e on the <br /> rnarN.et. <br /> There will be between 13.1 to 21.B acres of land under•gc~inq <br /> mining at any one time. Once mininb is completed ire each <br /> phase, reclaration will begin imrnediately. ~~~r mast phases, <br /> this will consist of sloping the shorelines and backfillind. <br /> R typical cr^oss section of the backfilled sh~_r•eline is shown <br /> in Figure E-1 ~_f the reclamation plan. The lama owner <br /> desires to have sc~rne of the or~~perty back.filled to create <br /> approxirnately ?.6 acres. <br /> <br /> TaSle D-i sh~~ws the dist ur•bance associated with each phase <br /> of the minino_ plan. <br /> <br />~j <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.