MINING PLAN <br />JANUARY, 2003 <br />OURAY COUNTY ROAD 8 BRIDGE DEPT <br />P. O. Box 468, Ridgway, CO 87132.0166 <br />PHONE 970628.6391 -FAX: 626439 <br />EXNISIT D <br />Rules 8 Regs 6.4.4 <br />°DALLAS 6RAYEL° PCIw1T N' M 1978-268 <br />SCC 3, T44N, RBW, NMPM, OuRAY County, CO <br />AYlNOMlNT APPLICATION - RCO 772 OPCR CONBT MATR <br />METHODS acra.a lap <br />Initial relocation of the current northeast topsoil stockpile shall be accomplished by end-dump trucks loaded <br />by front-loaders or by wheeled earthmover scrapers. Topsoil spreading back onto the finished slopebanks <br />and pit floor azeas shall be accomplished by similar hauling, with spreading of the topsoil downslope by <br />bulldozer. Extraction of gravel resource deposits shall be by pushing down raw material piles with a tracked <br />bulldozer working downslope. Wheeled front-loaders pick up the materials from the push-piles for loading <br />the processing equipment. Depth of extraction of raw material shall be to the previously-approved 2:1 <br />finish-design slope face, beginning with several feet deep at the top and progressing to about 166 feet of <br />vertical depth at the toe of the final finished slope. Headwall sideslopes of two-horizontal to one-vertical <br />(2:1), which was previously approved for the current toning & Reclamation Plans, shall be maintained <br />from the excavation boundaries to the finished pit floor during excavation. Crushing and screening <br />processing operations shall occur initially on the current (temporary) pit floor just west of the Stage 1 area. <br />Products shall be stockpiled on-site in partialy or wholly worked-out flat portions of the extraction areas. <br />Pre-mining stripping and stockpiling of surface soils and vegetation shall be by bulldozer and frontloader <br />combination. <br />Extraction of the 8%racre (initial) Stage Z area shall progress at the full 195- to 250-foot width from the top <br />of the currently disturbed slope (ENE edge) and proceed down the fall-line to the elevation of the current pit <br />floor (approx. elev. 7,380) in what will become the new "Stage 4", final extraction area. Processing of raw <br />gravel resources shall include a combination of crushing and screening operations. Stockpiles of produced <br />gravel aggregate material shall be located in the same (temporary) pit bottom, where it can be loaded for <br />truck & trailer transport to nearby area market applications. In Stage 4 half of this pit floor shall be utilized <br />at a time for processing & stockpiling while the other half is mined at successive 20-foot depths at a time, <br />for the remaining 100-foot depth of available material in the temporary pit floor. <br />Products shall be truck-hauled from the site to Ouray County road construction site applications. <br />EARTHMOVING -MINING aca,~-leg <br />Topsoil was previously stripped from Stage 1 areas and was stockpiled with wasted clayey soils from the <br />extraction areas in two current stockpiles, to be later used for reclamation topsoiling. The current stockpile <br />located in the north half of the Stage 1 area must be first relocated to the current pit floor in the futrure <br />Stage 4 area, or buried in over-excavated areas of Stage 1 area, before mining may resume under this <br />proposed permit amendment. Extracted gravel resources are then to be bulldozed downslope to the existing <br />temporary pit floor for processing. The relocated forest access road shall be incorporated into this first <br />excavation at the top (east-northeast) edge of Stage 1 area (just below a small portion of completed, <br />revegetated slope) from the existing loop access road at the north edge through to the southeast corner of <br />Stage 1 area. A grade of shallower than + 8% shall be maintained for the forest access road beginning at <br />elevation 7497 M.S.L. and temporarily ending at an elevation of approximately 7530 feet M.S.L. Stages 2 <br />& 3 shall extend this road east to its juncture with the existing road at the permitted area southwest corner. <br />The grade for that final reach of the road shall be approximately level at 7,530 feet elevation. <br />Twelve-foot wide stor7nwater runoff control benches shall be incorporated into the downslope-proceeding <br />excavations of all of the four stages, one at an elevation of approximately 7,450 feet M.S.L., and another at <br />File: ElOurdyCOlDallasGrav11f2AmmdAppl ~ 14 <br />071L7N3 <br />