My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE28090
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE28090
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:35:30 PM
Creation date
11/21/2007 11:49:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1987072
IBM Index Class Name
Enforcement
Doc Date
12/10/1991
Doc Name
PROPOSED SETTLEMENT AGREEMENT
From
MLRD
To
FIRST NATIONAL BANK OF FLORENCE
Violation No.
CV1991010
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />STATE OF COLORADO <br />-~ MINED LAND RECLAMATION DIVISION <br />Department of Natural Resources <br />1313 Sherman St.. Room 215 <br />Denver, CG 80203 <br />303 666-3567 <br />Fgx:303 632-8106 <br />pF Cpl <br />~~ -p~7 <br />NP:, O <br />O <br />~ /8]6 <br />SETTLEMENT AGREEMENT <br />Roy Romer, <br />Gavemor <br />Fred R. Banta. <br />Division D~reaor <br />Cessation Order No. Notice of Violation No. C-91-010 <br />Mine Name: La Plata Permit No.: C-87-072 <br />Permittee: First National Bank of Florence <br />Mailing Address: 101 East Main Street <br />Florence, Colorado 81226 <br />Operator <br />(If Other than Permittee): Same <br />Mailing Address: Same <br />County: La Plata <br />Type of Mine: Underground/Federal <br />The Mined Land Reclamation Division ("the Division") issued a certain Notice <br />of Proposed Amount of Civil Penalty, and the operator requested a conference <br />thereon, as authorized by C.R.S. 1973, 34-33-123(8). The requested conference <br />having been held as required by law, on November 26, 1991, the Division and <br />the operator hereby agree as follows: <br />1. The amount of the penalty shall be $1,000.00; <br />2. The penalty shall be paid to the Division by the operator not later <br />than 30 days from the date hereof; <br />3. Payment of such penalty by the operator shall constitute a waiver <br />of all further rights to review of such penalty or of the violation <br />on which it is based. <br />This agreement shall not be effective unless signed by the operator within ten <br />days after the closing date of such conference, which date is set forth below <br />opposite the signature of the Conference Officer. If not so signed, the <br />Division will fix the penalty at whatever amount it deems appropriate, based <br />upon the factors referred to in C.R.S. 1973, 34-33-123(8)(d). <br />DATE: <br /> <br />ERA <br />By <br />DIVISION OF MINED LAND RECLAMATION <br />Penalty Adjustment Reviewed <br />[Rule 5.04.3(4)(c>] <br />C.R.S. 34-33-123(8>(c)(d> <br />By <br />~~~ <br />onference Officer <br />vision Director <br />9665E <br />
The URL can be used to link to this page
Your browser does not support the video tag.