My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE28013
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE28013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:35:26 PM
Creation date
11/21/2007 11:48:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Enforcement
Doc Date
8/26/1992
Doc Name
BATTLE MTN RESOURCES SAN LUIS PROJECT M-88-112 3RD PARTY SAMPLING MEMO OF UNDERSTANDING CONTRACT &
From
PARCEL MAURO HULTIN & SPAANSTRA PC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ <br />EXHIBIT A <br />SCOPE OF WORK <br /> <br />This Scope of Work sets forth the work to be undertaken under the <br />terms of the Agreement for Environmental Consulting Services (the <br />"Contract") and the total costs associated with the work. The <br />purpose of the work is to provide independent oversight and review <br />of the monitoring conducted by Battle Mountain Resources at certain <br />monitoring locations associated with its tailings facility at the <br />San Luis Mine located in Costilla County, Colorado. The work will <br />consist of the review of relevant documents, preparation of certain <br />reports and guidelines, the oversight of sampling activities, the <br />analysis of samples obtained in the course of sampling activities <br />and the preparation of summary reports. The work will b$ conducted <br />in accordance with the terms of the Memorandum of Understanding <br />between BMRI and the DMG ("the MOU") and will consist of the <br />following specific activities: <br />Task 1. <br />Pre-Sampling Activities <br />Pre-sampling activities will include the preparation for <br />sampling at the site by the successful comple ion of the <br />safety training deemed appropriate and admitstered by <br />the Colorado Division of Minerals & Geology's Office of <br />Active Mines (previously "the Colorado D vision of <br />Mines"). The appropriate certification will a obtained <br />and maintained by the contractor for presentation upon <br />request. The Contractor will also complete whatever <br />safety indoctrination and/or training as may ]fie required <br />and administered by BMRI at its mine site. N cost will <br />be invoiced by the contractor for this mandate activity. <br />Task 2. <br />Preparation of Sampling Guideline <br />Contractor will prepare specific guidelines $or its use <br />in the conduct of the sampling activities. The <br />preparation of this guideline will include <br />familiarization with the monitoring required of BMRI in <br />the permit documents, familiarization with the sampling <br />and analytical protocol (TR-006), and the preparation of <br />a brief letter report summary of the Contractor's <br />sampling guideline. The guideline will be s~bmitted to <br />the DMG contract administrator for review a d comment. <br />The guideline will be revised appropriately n response <br />to direction from the DMG contract administrator. This <br />guideline will be provided to BMRI. i <br />
The URL can be used to link to this page
Your browser does not support the video tag.