My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE28013
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE28013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:35:26 PM
Creation date
11/21/2007 11:48:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Enforcement
Doc Date
8/26/1992
Doc Name
BATTLE MTN RESOURCES SAN LUIS PROJECT M-88-112 3RD PARTY SAMPLING MEMO OF UNDERSTANDING CONTRACT &
From
PARCEL MAURO HULTIN & SPAANSTRA PC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~+'"` <br />D. Reports <br />1. A summary report will be prepared subsequent to the completion of <br />each sampling event and the receipt of the analytical results from the <br />chosen laboratory. <br />2. The summary reports will include a surrunary of the sampling activities, <br />sampling observation documentation, "chain of custody" documentation, <br />the verbatim analytical results from the laboratory, with comments on <br />unusual or unexpected results, and recommendatiams for minor <br />sampling changes, if indicated by the analytical results. <br />E. Analysis of Samples <br />1. Samples collected hereunder shall be analyzed by the independent <br />analytical laboratory designated by DMG for the followi~g parameters: <br />Total Cyanide, WAD Cyanide and Copper in accor ance with the <br />approved analytical protocol set forth in TR No. 006. <br />2. In accordance with the approved TR No. 006 protocol; "field blanks", <br />"rinse blanks", and "duplicate samples" will be submitted for analysis by <br />the third party sampling contractor, at the contractors Qiscretion, with <br />the concurrence of the DMG project manager. <br />3. If analytical interferences are suspected to exist, the third party <br />sampling contractor may direct the analytical laboratory to perform <br />analysis for additional parameters, with the concurrenae of the DMG <br />project manager, after notification of BMRI. <br />F. Submittal of Invoices <br />1. The Agreement for Environmental Consulting Serviced requires that <br />invoices be submitted to DMG's project manager. <br />2. The DMG project manager shall review and approve Ithe invoice(s), <br />and return said invoice(s) to the third party sampling contractor with <br />comments for possible revision. <br />3. The DMG project manager shall forward approved invoices to BMRI <br />for payment. <br />-5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.