My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE28013
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE28013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:35:26 PM
Creation date
11/21/2007 11:48:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Enforcement
Doc Date
8/26/1992
Doc Name
BATTLE MTN RESOURCES SAN LUIS PROJECT M-88-112 3RD PARTY SAMPLING MEMO OF UNDERSTANDING CONTRACT &
From
PARCEL MAURO HULTIN & SPAANSTRA PC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ <br /> <br />2. The monitoring locations for each third party sampling event shall be <br />designated by DMG in advance of the sampling event and shall be <br />selected from the following approved monitoring locations: <br />a. Groundwater Monitoring Wells M-6, M-7, M-8, M-9, M-12, <br />M-13. <br />b. Surface Water Monitoring Site RS-4. <br />c. The Lower and Upper Tailings Ponds and the Cqllection Pond. <br />3. In the event that DMG determines on the basis of third party <br />sampling, that monitoring data obtained from the tailings facility by <br />BMRI to be inaccurate or unreliable, DMG may direct the third party <br />sampling contractor to conduct additional independents sampling and <br />subsequent sample analysis in accordance with the requitements of this <br />MOU, at the sole discretion of the DMG provided that such work is <br />within the work description and budget set forth in the'scope of work <br />attached to the Contract. In the event that such work is~not within the <br />scope of work, then DMG may propose a change order to the <br />Contract. <br />B. Direction of Sampling Activity <br />The DMG, through its project manager, shall direct the sampling and <br />analytical efforts of the third party contractor. <br />2. The DMG project manager shall schedule sampling activities with the <br />independent contractor. <br />3. The DMG shall provide BMRI a minimum of two work>lrtg days notice <br />to coordinate the sampling activity with its sampling, personnel or <br />contractor. <br />4. Split samples retained by BMRI shall be deemed by DMG to satisfy <br />any normal required sampling effort scheduled to oc ur within two <br />weeks of the independent sampling event. The DMG a~d BMRI shall <br />use their best efforts to coordinate sampling activities iti such a way as <br />to minimize duplication. <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.