My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE28013
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE28013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:35:26 PM
Creation date
11/21/2007 11:48:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Enforcement
Doc Date
8/26/1992
Doc Name
BATTLE MTN RESOURCES SAN LUIS PROJECT M-88-112 3RD PARTY SAMPLING MEMO OF UNDERSTANDING CONTRACT &
From
PARCEL MAURO HULTIN & SPAANSTRA PC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w ~` • • <br />evacuation; groundwater sampling method; field <br />parameter measurements, and sample filtration. <br />B. <br />Summary Reports <br />included within the contract cost projection. <br />complete an in-depth evaluation of the problem including <br />additional sampling and analytical protocol ~ if deemed <br />appropriate. If the DMG contract administra or concurs <br />with the recommended additional activities, an <br />appropriate Change Order to the contrac will be <br />requested. These supplemental activitie$ are not <br />Summary reports will be prepared subsequent to the <br />completion of each sampling event and the rec@ipt of the <br />analytical results from the chosen laboratory. These <br />reports will include a summary of the sampling <br />activities, sampling observation documentation, "chain of <br />custody" documentation, the verbatim analytical results <br />from the laboratory, with comments on ~{nusual or <br />unexpected results, and recommendations for minor <br />sampling changes, if indicated by the analytic 1 results. <br />these anticipated activities are included ~ithin the <br />contract cost projection. <br />In the event the DMG determines, on the basils of third <br />party sampling, that monitoring data from the tailings <br />facility by BMRI is inaccurate or unreliable, the DMG <br />contract administrator may request the contractor to <br />prepare an estimate of the work effort required to <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.