Laserfiche WebLink
w ~` • • <br />evacuation; groundwater sampling method; field <br />parameter measurements, and sample filtration. <br />B. <br />Summary Reports <br />included within the contract cost projection. <br />complete an in-depth evaluation of the problem including <br />additional sampling and analytical protocol ~ if deemed <br />appropriate. If the DMG contract administra or concurs <br />with the recommended additional activities, an <br />appropriate Change Order to the contrac will be <br />requested. These supplemental activitie$ are not <br />Summary reports will be prepared subsequent to the <br />completion of each sampling event and the rec@ipt of the <br />analytical results from the chosen laboratory. These <br />reports will include a summary of the sampling <br />activities, sampling observation documentation, "chain of <br />custody" documentation, the verbatim analytical results <br />from the laboratory, with comments on ~{nusual or <br />unexpected results, and recommendations for minor <br />sampling changes, if indicated by the analytic 1 results. <br />these anticipated activities are included ~ithin the <br />contract cost projection. <br />In the event the DMG determines, on the basils of third <br />party sampling, that monitoring data from the tailings <br />facility by BMRI is inaccurate or unreliable, the DMG <br />contract administrator may request the contractor to <br />prepare an estimate of the work effort required to <br />-3- <br />