Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 113 State :Colorado <br />Date : 10/16/2007 <br />User : RCO <br />Permit/job # : M-1980-055HR <br />County :San Miguel Abbreviation :none <br />Site :Topaz Mine Filename : MSHR-113 <br />Cost Breakdown : Utilization <br />Ownership cosUhour : $22.91 NA Shift basis : 1 per day <br />Operating cosUhour : $28.54 100 Data source : (CRG) <br />OperatorcosUhour : $32.96 NA <br />Total unit cosUhour ; $84.41 Total fleet cosUhour : $84.41 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 180 CCY factor : 1.165 volume : 210 LCY <br />Source of estimated volume :application maps <br />Source of estimated swell factor : na <br />HOURLY PRODUCTION <br />Excavator Cvcle Time (load bucket swing loaded dumb bucket swing emote) <br />Basic job condition description : AVERAGE <br />Bucket Caoacit <br />Cycte time value : 0.26 minutes <br />Rated bucket capacity : 0.77 LCY (heaped) Bucket size class : medium <br />Bucket fll factor : 0.85 Hard, tough clay (80% - 90%) <br />Adjusted bucket capacity : 0.65 LCY <br />Job Condition Correction Factors Source <br />Site altitude : 7,000 feet Altitude adjustment : 1.00 ~ (Cat HB) <br /> Job efficiency adjustment : 0.83 (1 shifUday) <br /> Net job correction : 0.83 multiplier <br />Unadjusted hourly unit production : 153.40 LCY/hour <br />Adjusted hourly unit production : 127.32 LCY/hour <br />Adjusted hourly fleet production : 127.32 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) Total job time : 1.65 hours <br />Secondary job condition within basic description : AVERAGE <br />Unit cost : $0.663 per LCY Total job cost : $139 <br />