Laserfiche WebLink
RECLAMATION REPORT SUMMARY <br />American Tunnel -Marshall Bertrand Millsite <br />Waste Dump Area <br />The reclamation plan for the American Tunnel waste dump area (which includes the azea <br />on the Marshall Bertrand Millsite affected by this request) anticipated removal and/or <br />burial of debris, contouring to blend with the surrounding contours and planting with the <br />Mountain Mix. The Post Mining Land Use was rangeland. <br />As an extension of TR-11, where approval was given to move the Lead Cazbonate <br />tailings to Tailings Pond No.1, the mine waste dump and underlying Lead Carbonate <br />tailings were removed and consolidated into Tailings Pond No.4. The slope, consisting of <br />the natural overburden material, was then contoured to match the surrounding azea, <br />amended with limestone at 1 ton/acre, planted with the Mountain Mix at 25 pls/acre, <br />fertilized with liquid fertilizer (32-0-0), and mulched with hay at 1 ton/acre. This work <br />was completed in 1995. <br />Since 1995, the area has been in the monitoring and maintenance phase of reclamation. <br />No maintenance work has been required in this azea. <br />Sunnyside has through its reclamation efforts satisfied all applicable portions of the area <br />reclamation plan in accordance with the Hard Rock/Metal Mining Rules and all <br />applicable requirements under the Act for the portion of the Marshall Bertrand Millsite <br />included in this report and corresponding request for release from further reclamation <br />responsibility. <br />Sunnyside Gold Corporation <br />By: ~.. <br />Larry Perino <br />Title: Reclamation Manager <br />Date: No,,. zz , zavy <br />