Laserfiche WebLink
~!~~l_YY~iLaucL._In~_ J <br />Environmental & anginaering <br />March 26, 2004 <br />Erica Crosby <br />Environmental Protection Specialist <br />Division Of Minerals and Geology <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80202 <br />~ ~ <br />Re: Challenger Pit (M-1985-026) Technical Revision <br />Dear Erica: <br />urvkivnmerrtal Supnnrt la: <br />• Trart,pmtatlan - <br />• Land IIevebpment <br />• a~ <br />• fiAisby <br />~ 1~-~/ <br />Coce~r~ ~x~..,f~R:as <br />As you requested, I have included a revised redamation plan for the Challenger Pit: The major <br />difference between this plan and the previous plan is the size and configuration of the lakes. I did not <br />include a revised reclamation cost because most of the reclamation has been done at this point. The <br />remaining work includes spreading topsoil, re-seeding and constructing a small lined pond that will <br />store augmentation water. I am not sure what the existing bond is, but would assume it might cover the <br />remaining work. <br />RECEIVE® <br />MAR 3 0 2004 <br />Sincerely <br />Divisieaof Minerals & DeolaAY <br />~-, ~M~( <br />Peter Wayland <br />President <br />10395 Colfax Ave.. Suite 350. Lakewood CO 80215 <br />ph 3D3-436-0957 lax 303-436-0953 <br />