Laserfiche WebLink
LIST OF MINING PLAN REQUIREMENTS <br />The following list of requirements are exactly like the ones contained within the body of this <br />exhibit. This list can be used as a table of contents or a quick reference during the implementation of the <br />permit. For additional information on a requirement please refer [o the page number stated a[ [he end of <br />the requirement shown in this list. Most requirements have discussions in the body of the exhibit. <br />PERMIT, AFFECTED LAND, AND PHASING REQUIREMENTS - <br />Requirement: The only land that may be disturbed within [he large permit area is [hat land <br />contained in Phase 1 and Phase 2 as shown on the maps in Exhibit C. (See Page 1!) <br />Requirement: The Affected Land Boundary defines [he limit of allowable disturbances within <br />this permit. (See Page 12) <br />Requirement: The affected land boundary shall be defined on [he ground and clearly marked <br />prior to initiation of operations. (See Page 12) <br />Requirement: No disturbances between the affected land boundary and the river are allowed <br />other than the streambank stabilization work described in this plan. No soil or overburden can <br />be stockpiled or placed for other purposes in the river setback zone. (See Page !3) <br />Requirement: The eastern edge of this mining operation is the eastern edge of Phase 1 as shown <br />on the maps. The Phase 2e area shown on the maps for Amendment 1 no longer exists and is not <br />included as a part of this plan. (See Page 13) <br />GENERAL GROUNDWATER REQUIREMENTS - <br />Requirement: Agreements with all well owners within 600 feet of the affected land boundary <br />must be honored. These agreements state that if a problem with a well occurs and that problem <br />is due to the operation, the operator is responsible for correcting the problem. (See Page !4) <br />Pueblo East Pit Amendment 3 (2007) Exhibit D Page 2 of 34 <br />