My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE27212
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE27212
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:34:54 PM
Creation date
11/21/2007 11:32:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Enforcement
Doc Date
8/21/1992
Doc Name
MEMO OF UNDERSTANDING BETWEEN DMG & BATTLE MTN RESOURCES INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />DRAFT <br />C. Sample Collection Procedures <br />1. The third party sampling contractor shall observe B)~IRI complete <br />sampling ilndfi[ter-gt;f Ie'COillecteci:saleS. i <br />2. The third party sampling contractor shall accept a s I~t sample to <br />preserve and ship to the analytical laboratory it shall ~etain for such <br />purpose. <br />3. The third party sampling contractor shall observe the sf~~~p}e-et~tetthe <br />analytieal-labefeter}; decontamination of all sampli g equipment, <br />bailing and sample collection. <br />4. The third party sampling contractor shall complete an acceptance form <br />for each sample, including its appraisal of whether I the sampling <br />technique employed by BMRI conforms with the approv~d TR No. 006 <br />protocol. <br />5. If the third party contractor refuses to accept said samp a and states a <br />specific objection to it, BMRI shall perform the sam ling a second <br />time. If concurrence cannot be reached after resampli g, the sample <br />shall be r'efain;'ana.::sulitiutted. for.analys5bpf designate as 'rejected" <br />and be considgreil.:in dispute. <br />6. The third party sampling contractor shall be responsibl for providing <br />all necessary bottles, reagents, packing, coolers, prese ation needs, <br />custody forms, and all other sampling materials as needed to conduct <br />said sampling pursuant to the TR No. 006 protocol. <br />7. The third party sampling contractor shall be responsive for sample <br />preservation, transportation and delivery to the indepen ent analytical <br />laboratory. <br />8. All sampling, analysis and reporting shall comply with the approved <br />TR-006 protocol. <br />9. The third party sampling contractor shall document its co pliance with <br />the approved TR-006 protocol. <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.