Laserfiche WebLink
<br /> <br />DRAFT <br />conducted at DMG's direction nro--~:.ar~~ three ti~tes during the <br />first three calendar months following final approval of the TR No. 006 <br />protocol ; aid the execution of the Contract,~»~~ea~l-bevel-e€ <br />His-A491:~ twice during the subsequent three (3) month period, and <br />twice during the final six (6) months of the term of thi MOU. <br />2. The monitoring locations fot each third party sampling event shall be <br />designated by DMG in advance of the sampling even and shall be <br />selected from the following approved monitoring local#ons: <br />B. Direction of Sampling Activity <br />1. The DMG, through its project manager, shall direct the Sampling and <br />analytical efforts of the third party contractor. <br />2. The DMG project manager shall schedule sampling acti tttes with the <br />independent contractor. <br />3. The DMG shall provide BMRI a minimum of two worki g days notice <br />to coordinate the sampling activity with its sampling ersonnel or <br />contractor. <br />4. Split samples retained by BMRI shall be deemed by D G to satisfy <br />any normal required sampling effort scheduled to oc within two <br />weeks of the independent sampling event. The DMG an BMRI shall <br />use their best efforts to coordinate sampling activities in ch a way as <br />to minimize duplication. <br />-3- <br />