Laserfiche WebLink
Page 2 <br /> Mr. Joseph Dudash <br /> July 2, 1993 <br /> All cleanup work is continuing. <br /> C-93-040 A contractor has been retained and is removing <br /> scrap from the warehouse area. Most other sites have been <br /> cleaned and reclamation has been initiated for certain other <br /> areas. <br /> For July 15 Abatement: <br /> C-93-041 Coal slurry has been removed from terraces and <br /> outslopes and the areas reseeded. Final cleaning of the Gabion <br /> baskets on the top bench will be completed. <br /> C-93-058 Spillage from refuse conveyor has been cleaned as <br /> have the drip pans. Disturbed material outside sediment control <br /> areas is being removed. Windblown coal in the buffer zone is <br /> being removed. other work is complete or will soon be completed. <br /> C-93-062' Road ditches are nearly completed. Revisions have <br /> been submitted to the Division. <br /> If you have any questions, please_ contact me at (719) 868- <br /> 2761, Extension 107 . <br /> Sincere y, <br /> a d Q Th Rq P <br /> Senior Mine Eng ' eer <br /> RGT/bb <br />