My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-08-26_ENFORCEMENT - C1981012 (10)
DRMS
>
Day Forward
>
Enforcement
>
Coal
>
C1981012
>
1993-08-26_ENFORCEMENT - C1981012 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2021 9:46:20 AM
Creation date
11/21/2007 11:32:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Enforcement
Doc Date
8/26/1993
Doc Name
CHECK STUBS
Violation No.
CV1993035
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14300 Highway 12 <br /> Weston, Colorado 81091 <br /> (719) 868-2761 <br /> FAX (719) 868-2275 <br /> BASIN <br /> RESOURCES,INC. July 2 , 1993 <br /> a subsidiary of ENTECH, Inc. <br /> Mr. Joseph Dudash RECEIVED <br /> Reclamation Specialist <br /> Office of Mined Land Reclamation JUN 25 1993 <br /> 1313 Sherman Street, Room 215 <br /> Denver, CO 80203 <br /> Division of Minerals�OcwugY <br /> RE: Request for NOV Abatement Date Extension <br /> New Elk Mine Permit No. C-81-012 <br /> Dear Mr. Dudash: <br /> Due to the large quantity of remedial work required by the <br /> NOV's issued during the April 5 through 9 and April 12 through 16 <br /> inspections, a contractor has been retained and has been working <br /> seven days per week. Therefore Basin Resources, Inc. (BRI) <br /> requests - an abatement time extension from June it to July 8 for <br /> certain NOV's and to July 15 for certain others. Following is a <br /> listing of those NOV's: <br /> For July 8 Abatement: <br /> C-93-034 Final additions and . line clearing is underway. <br /> C-93-035 Most work on cleaning culverts and drop inlet No. <br /> .2 has been completed. A section of culvert has been ordered to <br /> close the open inlet center of C5. Work on cleaning remaining <br /> culverts and attempting to locate the outlet of. the "fireplug" <br /> culvert and open the D26 to river culvert is underway. <br /> C-93-036 All upland diversion ditches have been cleaned, <br /> reshaped and increased in cross section to design. Most other <br /> listed ditches have been reworked or newly cut. Remaining work <br /> is in progress. <br /> C-93-038 Revisions have been submitted to remove culverts <br /> no longer required or in service. Culvert C40 has been installed <br /> and C13 will be removed. <br /> C-93-039 A culvert has been installed in Dll. Coal <br /> spillage east of the silos - has been cleaned. Spilled oil and <br /> contaminated soil have been placed in drums. Samples have been <br /> submitted to the processor for evaluation and directions to BRI <br /> for shipping. Cleaning of the windblown coal is in progress. <br />
The URL can be used to link to this page
Your browser does not support the video tag.