My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE27114
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE27114
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:34:50 PM
Creation date
11/21/2007 11:31:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Enforcement
Doc Date
12/9/1992
Doc Name
STATUS & PROGRESS REPORT BATTLE MOUNTAIN GOLD 04/23/1992 VIOLATION BOARD ORDERED ABATEMENT PLAN
From
DMG
To
MLRB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />-z- <br /> <br />5. Leak Detection System Effluent Containment: <br />Status: Satisfied. BMG committed to repair the primary liner if <br />a leak is detected. <br />6. Cyanide Detection, Interception, Containment and Remedial <br />Treatment: <br />Status: Technical Revision No. 8 - Additional Groun¢ Water <br />Monitoring Wells - Second response in review. Technical Revision <br />No. 9 Surface Water and Ground Water Containment Plan - review <br />complete. <br />Progress: DMG has sent BMG a second set of review cdmments for <br />TR-8. BMG is preparing their response. DMG approved TR-9 <br />conditionally upon approval of TR-8. <br />7. Modification of Ore Processing Methodology: <br />Status: No change from October report. BMG submitt$d a written <br />commitment to comply in a letter of May 16, 1992. <br />8. Modification of Tailings Area Reclamation Plan: <br />Status: In compliance with Board Order. <br />Progress: BMG has proposed that the agreed to 180 d$y time period <br />for the evaluation of the tailings area reclamation plan start <br />November 15, 1992. The evaluation is due by April 15, 1992. <br />9. Modification of Environmental Monitoring Plan: <br />Status: In compliance with Board Order. <br />Progress: Technical Revision No. 6 "Quality Assurance/Quality <br />Control Protocols for Collection of Surface and Ground Water <br />Quality Data" has been approved and these protocols have been <br />implemented. <br />10. Adjustment of Financial Assurance: <br />Status: No change from October report. BMG submitt$d a written <br />commitment to comply in a letter of April 16, 1992. <br />This item will be considered at the time of any nec@ssary <br />Modification of the Tailings Area Reclamation Plan (Abatement <br />Item 8). <br />
The URL can be used to link to this page
Your browser does not support the video tag.