My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE27038
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE27038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:34:47 PM
Creation date
11/21/2007 11:30:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982055
IBM Index Class Name
Enforcement
Doc Date
9/15/1999
Doc Name
1999 SITE MAINTENANCE RATON CREEK MINE PN C-82-055
From
DMG
To
ENERGY FUELS MINING CO
Violation No.
CV1999011
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />~ • III 111111 III IIII III <br />g - <br />____~ STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department o(Nalural Resources <br />1313 Sherman SI., Room 215 <br />DIVISION O F <br />Denver, Colorado 80203 <br />Phone: (30]1 866-3567 MINERAL S <br />FAX: (303)832-8106 & <br /> GEOLOGY <br /> RECLAMATION <br /> MININ G•SAFETY <br />September 15, 1999 <br /> Rill Owens <br /> Governor <br />Greg E. Walther <br />Allen S. Weaver Execus,ve Drtena <br />Mine Engineer Michael R. Long <br />Division Director <br />Energy Fuels Mining Company <br />P.O. Box 449 <br />Florence, CO 61226 <br />RE: 1999 Site Maintenance, Raton Creek Mine, Permit No. C-82-055 <br />Mr. Weaver: <br />The Division of Minerals and Geology has reviewed the information received by FAX on <br />August 11, 1999 concerning necessary site work at the Raton Creek Mine. Our <br />understanding of the time frames is as follows: <br />1. Inter-seeding work (or other mitigation work) for the sparse vegetation area will <br />be done in conjunction with Minor Revision No. 17 (MR-17) and no later than <br />November 15, 1999 or the end of the approved planting period. <br />2. Refuse Ditch construction work will begin the last week in September <br />3. The backfilling of the subsidence holes will be done when the equipment is on- <br />site for the refuse ditch work. This is likely no later than the middle of October for <br />completion of the backfilling/stabilization work of the two subsidence features. <br />If this is not your intention, please let us know in advance in writing. Otherwise, the <br />Division expects this work to be completed under this time schedule. If you have~any <br />questions, please call me. <br />Sincerely, <br />~D~^^-~ <br />1 <br />Kent Gorham <br />Environmental Protection Specialist <br />CC: Dan Hernandez <br />.r . <br />
The URL can be used to link to this page
Your browser does not support the video tag.