My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE27011
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE27011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:34:46 PM
Creation date
11/21/2007 11:29:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Enforcement
Doc Date
8/7/1985
Doc Name
Letter on Permit Revision
From
ANACONDA MINERALS CO
To
OSM
Violation No.
CV1993112
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />1630 Acre Permit Revision <br />Response to Adequacy Comments <br />B L M <br />The following responses are in reference to a letter received by <br />West Elk Coal Company from the Bureau of Land Management, <br />Montrose District Office. Response numbers correspond to <br />adequacy question numbers specified in the letter. <br />1. The limit of predicted bad ground has not been defined <br />extensively by West Elk Coal Company. The area shown as <br />predicted bad ground was defined preliminarily by drill <br />hole information and geologic mapping. This limit is <br />subject to change based on actual information obtained as <br />we mine the area. Coal resources will be recovered to the <br />maximum extent possible based on the ground conditions. <br />Panels will be lengthened or shortened as conditions ~ <br />dictate. <br />Dur records indicate that the block of coal in the Nf4, NEK <br />of Section 20 was not shown as being mined in the original <br />permit (Exhibit 3.4.4B), but was subsequently added in the <br />permit revision dated March 1, 1983, titled Main Entry <br />Relocation and also subsequent adequacy responses dated <br />June 1, 1983 (Exhibit 3.4.4.A revised) which was reviewed <br />by OSM, BI.M, Q~ALRD, etc. and approved. <br />The coal in Section 17 is in the process of being assigned <br />to Bear Coal Company, however, the mine plans and maps <br />submitted in the 1630 Acre Permit Revision do not reflect <br />this since the permit revision was applied for before the <br />Bear assignment took place, <br />4. There is no current requirement to prevent mining of the <br />panels south of the No. 1 East Submains before subsidence <br />data is obtained from panel 1W-1S off the No. 1 West <br />Submains. The requirements for mining panels south of the <br />No. 1 East Submains are the same as the requirements for, <br />mining panels off the No. 1 West Submains since both areas. <br />are north of the Minnesota Creek drainage basin divide. <br />DPC/jm <br />5-22-85 <br />
The URL can be used to link to this page
Your browser does not support the video tag.