My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE26985
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE26985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:34:45 PM
Creation date
11/21/2007 11:29:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Enforcement
Doc Date
10/7/1996
Doc Name
SENECA II-W MINE C-82-057 NOV C-95-023 EXTENSION OF ABATEMENT DEADLINE BEYOND 90 DAYS
From
DMG
To
MIKE LONG
Violation No.
CV1995023
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OCT 07 '96 08:41RM PERHODY WSTN SENECR MINE <br />P.2 <br />Seneca Coal Com <br />October 7, 1996 <br />Ms. Erica Crosby <br />Division of Minerals and Geology <br />1313 Sherman street; Room 215 <br />Der_ver, CO 80203-2273 <br />i:N: Seneca"ii-W Mine Permit C-8Z-057, NOV C-95-OZ3 <br />Dear Ms. Crosby: <br />This correspondence is a request for a final extension of time for <br />the abatement of NOV C-95-023 to the Seneca II-W Mine Permit C•82- <br />GS~. The current abatement deadline for this NOV is Thursday, <br />October: iOtY{. <br />The Division approved Technical Revision No. 25 on August 26, 1996. <br />Thie revision provided the revised plan for Lhe Field work <br />nacessary to abate this violation. upon completion of the public <br />comment period in the middle of September, Seneca initiated work on <br />the abatement plan. We have removed the topsoil over the area which <br />nee<de t~ b~ rograded. Seneca still needs to get the final elope <br />5aC': ::~ 3 3:., replace the topsoil and revegetate the rediaturbed <br />aCreag2, Because of the final construction work required to move <br />the 550 dragline from the Seneca IT mine to the Yoast property, all <br />mobile equipment operators had been assigned to this project. Since <br />char dragline should start walking sometime this week, we will now <br />3~a able to complete the remaining abatement work. Unfortunately, <br />~iiGpe tae:ks krill not be completed by Thursday the 10th. I am asking <br />3:'tsz a °ina7. 50-day ext~enaion of the current deadline to December <br />9°,-~. tU complete the field work which is in process. <br />should yc,u or any other members of the Division have any questions <br />rag3rding this information, please do not hesitate to contact me. <br />Sincerely, ~~ , Q~ <br />Michael G. Altavilla, P.E. <br />Engineering Manager <br />c: easy Wendt (PwCC) <br />Ssneoa Coal Company • P.O. Drowar D • Hayden, Colorado 81859 <br />Telephone (970) 276707 • FAX (970) 276014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.