Laserfiche WebLink
June 24, 2003 -iv- 003-2203.7 <br />• Drawing 14 <br />Drawing 17 <br />Drawing 18 <br />Drawing 19 <br />Drawing 20 <br />Drawing 21 <br />Drawing 22 <br />Drawing 23 <br />Drawing 23a <br />Drawing 24 <br />Drawing 25 <br />Drawing 26 <br />Drawing 27 <br />Phase N Leak Detection and Erosion Control Details <br />Phase N VLF Sections and Details <br />Phase N PSSA Bottom Geosynthetics Layout and Details <br />Phase N PSSA Top Geosynthetics Layout and Details <br />Phase N PSSA Sections and Details <br />Phase N Ore Storage Area Grading Plan and Geosynthetics Layout Near PSSA <br />Phase N PSSA Solution Recovery Sump Plan and Sections <br />Phase N PSSA Riser Section and Details <br />Riser Pipe Details <br />Phase N High Volume Solution Collection Details <br />Phase N Low Volume Solution Collection Details <br />Phase N PSSA Sections <br />Phase N Carlton Mill Demolition <br />LIST OF APPENDICES <br /> Appendix A Record (As-built) Drawings <br /> Record Drawing No. 1 General Composite Overview <br /> Record Drawing No. 2 Primary, Secondary, and Tertiary Underdrain As-builts <br /> Record Drawing No. 3 Top of Soil Liner Fill As-built <br /> Record Drawing No. 4 Leak Detection Trench As-built <br /> Record Drawing No. 5 Bedding Fill As-built <br /> Record Drawing No. 6 Geomembrane Record Drawing: PSSA Lower Geomembrane <br /> Record Drawing No. 7 Geomembrane Record Drawing: PSSA Upper Geomembrane <br />Record Drawing No. 8 Low Volume Solution Collection As-built <br /> Record Drawing No. 9 High Volume Solution Collection As-built <br /> Appendix B Photographic Documentation <br /> Appendix B-1 Photograph Log <br /> Appendix B-2 Documentary Photographs <br /> Appendix C Staff Schedule for Golder Personnel <br /> Appendix D Weekly Reports <br /> Appendix E Specifications <br /> Appendix F Surveyor's Certificate <br /> Appendix G Subgrade Acceptance Forms <br /> Appendix G-1 Lower Liner Subgrade Acceptance Forms <br /> Appendix G-2 Upper Liner Subgrade Acceptance Forms <br /> Appendix H Concrete Observation and Testing Results <br /> Appendix I CQA Laboratory Test Results <br /> Appendix I-1 Grain Size Distribution, Moisture Content and Atterberg Limits <br /> Appendix I-2 Compaction Tests <br /> Appendix I-3 Soil Liner Fill Permeability Tests <br /> Appendix J Geomembrane Quality Control Documents and Inventory <br /> Appendix J-1 Geomembrane Inventory Control <br /> Appendix J-2 Resumes of Installation Personnel <br /> Appendix J-3 Geomembrane Resin Quality Control Certificates <br /> Appendix J-4 Geomembrane Roll Quality Control Certificates <br /> Appendix J-5 Welding Rod Quality Control Certificates <br />• Appendix J-6 Geotextile Roll Quality Control Certificates <br />Appendix J-7 HDPE Pipe Certifications <br /> <br />L\00\330]\Oi00\FOICertPS5A060]\00]33W.0400.0]3~13Rep.dw Golder Associates <br />