Laserfiche WebLink
June 24, 2003 -iii- 003-2203.7 <br />• LIST OF TABLES <br /> Table 1 Summary of Earthworks Material Specifications <br /> Table 2 Summary of Weather Data <br /> Table 3 Underground Remediation Summary-PSSA Underground Workings <br /> Table 4 Earthworks CQA Test Summary and Testing Frequency <br /> Table 5 CQA Laboratory Test Summary, Underdrain Fill <br /> Table 6 CQA Laboratory Test Summary, Select Structural Fill <br /> Table 7 CQA Laboratory Test Summary, Leak Detection Fill <br /> Table 8 CQA Laboratory Test Summary, Structural Fill <br /> Table 9 CQA Laboratory Test Summary, Soil Liner Fill <br /> Table 10 CQA Laboratory Test Summary, Bedding Fill <br /> Table I i CQA Laboratory Test Summary, Low Volume Solution Collection Fill <br /> Table 12 CQA Laboratory Test Summary, Drain Cover Fill <br /> Table 13 CQA Laboratory Test Summary, Select Drain Cover Fill <br /> Table 14 CQA Laboratory Test Summary, Fine Shafr Backfill <br /> Table 15 Field Density and Moisture Content Test Summary, PSSA Soil Liner Fill <br /> Table 16 Field Density and Moisture Content Test Summary, PSSA Low Volume Solution <br /> Collection FiII <br /> Table 17 Soil Liner Fill Depth Verification Summary <br /> Table 18 Concrete CQA Laboratory Testing Summary <br /> LIST OF FIGURES <br />• Figure 1 Cresson Project VLF Site Plan <br /> Figure 2 Certification Boundary <br /> Figure 3 Destructive Sample Test Codes for Extrusion Welds with Leister Heat Seams <br /> Figure 4 Destructive Sample Test Codes for Dual Hot Wedge Fusion Welds <br />LIST OF IFC DRAWINGS[ <br />Drawing 2b <br />Drawing 2c <br />Drawing 3 <br />Drawing 4 <br />Drawing Sb <br />Drawing Sc <br />Drawing 66 <br />Drawing 6c <br />Drawing 7b <br />Drawing 7c <br />Drawing 9b <br />Drawing 106 <br />Drawing lOc <br />Drawing 11 <br />Drawing 12 <br />• Drawing 13 <br />' Only drawing <br />Phase IVb Existing Valley Leach Facility Site Conditions Sheet 1 of 2 <br />Phase Nb Existing Valley Leach Facility Site Conditions Sheet 2 of 2 <br />Phase N Site Geology Map <br />Phase IV Site Grading General Plan <br />Phase Nb Site Grading Plan Sheet 1 of 2 <br />Phase Nb Site Grading Plan Sheet 2 of 2 <br />Phase Nb Known Underground Workings and Surface Reconnaissance Sheet 1 of 2 <br />Phase Nb Known Underground Workings and Surface Reconnaissance Sheet 2 of 2 <br />Phase Nb Remediation Areas and Cut/Fill Isopach Sheet 1 of 2 <br />Phase IVb Remediation Areas and CuUFill Isopach Sheet 2 of 2 <br />Phase Nb Site Survey Control Plan <br />Phase Nb High Volume Solution Collection Piping Layout Sheet I of 2 <br />Phase Nb High Volume Solution Collection Piping Layout Sheet 2 of 2 <br />Phase N Valley Leach Facility Cross Sections <br />Phase N Underground Working Remediation Details <br />Phase N Underdrain Details <br />s relevant to Phase IVb PSSA construction aze presented. <br />moonzo3~aoo~emcmessrowz~oodxzo~.oaoo.onazrtw.doo Golder Associates <br />