iii iiiiiiiiiiiu iii <br />BATTLE MOUNTAIN GOLD COMPANY <br />December 14, 1992 <br />Mr. Larry Oehler <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: Battle Mountain Resources, Inc. <br />DMG Permit No. M-88-112 <br />Request for Technical Revision <br />Dear Mr. Oehler: <br /> <br />DEC 1 81992 <br />DfVISIU;~~ ~~ <br />MINERALS ~ GF(; _, .r,,. <br />i <br />~: <br />~~._-.~ <br />BATTLE MOUN W N <br />GOLD COMPANY <br />(BMRI) - San Luis Project <br />No. 012, Warehouse Addition <br />The quantity and variety of warehouse inventory items is being <br />increased to better serve the needs of the operation. To provide <br />adequate storage for the additional inventory items, an outside <br />covered parts rack is being constructed adjacent to and covering <br />the existing parts rack to the south of the warehouse building. <br />This letter serves as a request for a technical revision, TR-012, <br />to include the warehouse addition with our operating permit. <br />The existing outside uncovered parts storage area is directly <br />south of the warehouse building and consists of a 25'x70' <br />concrete slab of 4 inch thickness reinforced with wire mesh. The <br />parts storage addition is directly south of the existing slab and <br />is a 15'x70' concrete slab of 4 inch thickness reinforced with <br />wire mesh. Both the existing and new concrete slabs will be <br />covered with a 14' high metal roof and sided on the south and <br />east. The west end of the storage area will remain open. The <br />storage area shed will be of similar type construction, I-beam <br />frame and metal siding, to the warehouse. A plan view sketch of <br />the warehouse area is enclosed. <br />The reclamation cost for the additional concrete slab and open- <br />air building is based on estimated costs from the approved <br />reclamation plan. Building removal costs were estimated at <br />$0.13/f t'. The building will be 40'x70'x14' or 39,200 ft3. The <br />estimated building disposal cost is $5100. The removal costs of <br />a 4 inch floor were estimated at $1.69/ft'. The new concrete <br />slab will be 15'x70' or 1050 ft'. The estimated floor removal <br />cost is $1775. The addition is located within a disturbed area; <br />therefore, ripping, grading, and topsoil spreading costs have <br />been accounted for in the approved reclamation plan. The total <br />cost of reclamation for the warehouse addition, including a <br />contingency of 25~, is $8600. This represents less than 0.003% <br />of the existing $3.3 million reclamation bond. <br />P.O. BOX 310 SAN LUIS, COLORADO 81152-0310 (719) 672-3362 FAX (719) 672-3363 <br />