Laserfiche WebLink
i <br /> <br /> <br />J. J. Dudash - 2 - August 23, 2000 <br />2. The topsoil stockpile will be located such that wash down water from the <br />overhead conveyor belt will not contaminate the topsoil. <br />3. The sewage treatment pond was annotated as requested. <br />4. The upland diversion ditch was added to Map 8-3. <br />5. A minor revision will be submitted if material is exported from the Bowie No. 2 <br />Mine for use on this project. <br />6. Enclosed is a bond estimate which indicates the bond will increase $14,562 as a <br />result of this permit action. <br />Please call if you have any questions. <br />Silncerer <br />J. E. Stover, P.E. <br />Consulting Engineer <br />cc: Wm. A. Bear, Jr. <br />