Laserfiche WebLink
CIRCES Cost Estimating Software <br />Task # <br />Date <br />User <br />005 <br />08/19/2004 <br />State :Colorado PermiUjob # :M-2000-158 <br />County :Weld Abbreviation :none <br />ESC Site : S&H Mine <br />Agency or organization name :OMG <br />Permit or other job acgon :AM-01 <br />Task description :Grade 100 acres of disturbed area <br />HOURLY EQUIPMENT COST <br />Basic machine :CAT 140H Horsepower : 165 <br />Attachmentno.l:NA <br />Attachment no. 2 :Multishank <br />MATERIAL QUANTITIES <br />Source of estimated acreage :Operator Estimate <br />HOURLY PRODUCTION <br />Shift basis : 1 per day <br />Selected application : Finish grading (0-2.5 mph) <br />Average grader speed : 1.25 mph <br />Selected blade angle : 30 degrees ' ' at 0 degrees, blade is perpendfalar <br />Effective blade length : 10.40 feet ro direaion or travel. <br />Width of blade overlap per pass : 2.00 feet <br />Net grading or ripping width per pass : 8.40 feet " "width of ripper beam on ripping applications <br />Unadjusted hourly unit production : 1.2727 acres/hour <br />Job CondiBon Correction Factors Source <br />Average site altitude : 4,770 feet Altitude adjustment factor : 1.00 ~ (Cat HB) <br /> Job efficiency adjustment factor : 0.85 (1 sh/d, mod.) <br /> Net job correction : 0.8500 multiplier <br />Adjusted hourly unit production : 1.0818 acres/hour <br />Adjusted hourly fleet production : 2.1636 acres/hour <br /> <br />J08 TIME AND COST <br />Fleet size : 2 grader(s) Total job time : 46.22 hours <br />Total area to be graded or ripped : 100.00 acres <br />Filename :M158-005 <br />Unit cost : $73.70 per acre Total job cost : $7,370 <br />, n ; <br />