My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-08-20_REVISION - M2000158
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000158
>
2004-08-20_REVISION - M2000158
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:45:19 PM
Creation date
11/21/2007 11:26:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000158
IBM Index Class Name
Revision
Doc Date
8/20/2004
Doc Name
Reclamation Coat Estimate
From
DMG
To
Platte Sand & Gravel LLC
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 004 <br />Date : 08/19/2004 <br />User : ESC <br />State :Colorado <br />County :Weld <br />Site : S <br />Pennitfjob# :M-2000-158 <br />Abbreviation :none <br />Filename :M158-004 <br />Agency or organization name :DMG <br />Permit or other job action :AM-01 <br />Task descdpflon : BacMil/ 8 Grade GW Pond <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />Basic machine :Cat D8R Series 11 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3shank ripper <br /> Utilization <br />OwnershipcosUhour: $49.85 NA <br />Operating cosUhour : $69.48 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $31.83 NA <br />Total unit cosUhour : $151.16 Total fleet cost/hour <br />MATERIAL QUANTITIES <br />Initial <br />volume : 73,d40 LCY <br />Swell <br />factor <br />Source of estimated volume :DMG Estimate <br />Source of estimated swell factor : NA <br />Average push distance : 150 feet <br />Unadjusted hourly production : 634.3 LCY/hr <br />Material consistency description <br />Compacted rill or embankment <br />Average push gradient : 0.00 % (1 <br />Average site altitude : 4,770 feet <br />Material weight : 2,900 Ibs/LCY <br />Weight description <br />Sand and gravel -Dry <br />Horsepower: 310 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Loose <br />NA volume : 73,440 LCY <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br />0.75 <br />0.90 <br />1.00 <br />1.00 <br />0.83 <br />0.80 <br />1.00 <br />1.00 <br />0.79 <br />1.00 <br />0.36 <br />x151.1 s <br />Source <br />225.39 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time <br />Unit cost : $0.671 /LCY Total job cost <br />8SU <br />049,253 <br />
The URL can be used to link to this page
Your browser does not support the video tag.