My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV17615
DRMS
>
Back File Migration
>
Revision
>
REV17615
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:29:17 AM
Creation date
11/21/2007 11:26:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
5/3/1995
Doc Name
TR21 REFUSE DISPOSAL PILE ADEQUACY REVIEW 1 FOIDEL CREEK MINE C-82-056
From
DMG
To
TWENTYMILE COAL CO
Type & Sequence
TR21
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'~ <br />the 2.5 feet of required cover. <br />Please commit to a specific time frame for analysis of the <br />prep plant waste product. (i.e. within 30 days after start-up, <br />etc.) Include in the text the commitment to forward this <br />information to the Division accompanied by a certified <br />statement from a registered P. E. concerning the results of <br />this analysis and how it compares to the original assumptions <br />and subsequent design. <br />8. As required by Rule 2.05.3(8)(a)(i)(C), please submit, as part <br />of the permit text, a discussion of the hydrologic impacts to <br />surface and ground water, in particular the volume, quantity, <br />and quality of water that will exit the pile through the <br />outlet drains. <br />9. How will particles larger than 12 inches be removed from the <br />cover material as specified in the CTL report? <br />10. Previously, the Division has been informed that some <br />operations consider consultant recommendations as optional <br />requirements and not part of the required design. Please <br />affirm in writing that all the recommendations of the CTL <br />report will be utilized as part of the design unless <br />specifically superseded or excluded in writing by TCC. <br />11. Is a new table of contents required due to the new exhibits? <br />If so, please submit two copies of the appropriate pages of <br />the table of contents. <br />Due to your desire to expedite this revision approval, I would urge <br />you to call if there is any confusion as to what the Division is <br />requesting. <br />Sinc rely, , <br />~~~i <br />Ken A. Gorham <br />Environmental Protection Specialist <br />cc: David Berry, DMG <br />
The URL can be used to link to this page
Your browser does not support the video tag.