My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-11-21_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2002-11-21_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:49 PM
Creation date
11/21/2007 11:25:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
11/21/2002
Doc Name
Weekly Const. Report
From
CC&V
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase IVb Weekly Summary No. 5 Page 2 003-2203 <br />November 9`~ <br />Ames continued backfill of the interior anchor trench along the 9606 road on the Phase III ore slope <br />at the completion of geomembrane QA testing. Ames backfilled approximately 300 linear feet of <br />anchor trench. <br />Phase IVc <br />Ames performed excavation remediation activities for underground workings UG-307, UG-308, <br />UG-506, UG-507, UG-509, UG-550 through UG-555, and UG-557. <br />Ames performed confirmatory drilling activities associated with the Phase IVc construction area on <br />underground workings UG-304 and UG-310. <br />Ames placed Structural Fill (SF) over previously remediated workings at UG-270 and UG-505. <br />Ames placed Cemented Rockfill (CR) at UG-279 by tapering the working and placing 7 feet of CR in <br />accordance with IFC Drawing 12, Detail 1. <br />Field Monitorine and Testing Activities <br />Golder observed construction activities associated with Phase IV earthworks. All construction <br />materials and soil materials placed were verified as suitable, and construction methods were in <br />accordance with project specifications. Removal of oversized and deleterious material from all fill <br />areas was observed. Golder observed Structural Fill (SF) placement in Phase IV for materials, lift <br />thickness, moisture content, and compactive effort. <br />Golder observed and documented excavation remediation activities associated with the Phase N <br />underground working construction. Workings were designated as "Shallow or Deep" as defined in <br />the drawings and will be remediated accordingly. <br />Golder observed placement of SF and CR for undera ound working remediation. These materials were <br />placed in accordance with the drawings and specifications into excavated or open underground <br />workings. Golder previously obtained samples of SF, Select Structural Fill (SSF), and CR for <br />laboratory testing. Materials supplied met specifications. <br />Golder observed backfill of the geomembrane anchor trench for proper dimensions, lift thickness, <br />compaction, and use of suitable material. <br />Golder observed geomembrane repairs, documenting ambient air temperature, seaming, tie-in <br />overlap, and seam testing (trial seams, pressure, vacuum, and destructive). Geomembrane placed in <br />Phase Nb met specifications. <br />Golder. observed and documented confirmation drilling activities associated with the Phase iV <br />construction. Full-time monitoring was given to confirmation drilling of underground workings, <br />PM1aze IVbi On2'I-Nov9.doc Golder Associates Inc. <br />