My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-11-21_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2002-11-21_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:49 PM
Creation date
11/21/2007 11:25:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
11/21/2002
Doc Name
Weekly Const. Report
From
CC&V
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ASSOCI2-teS <br />November 12, 2002 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, CO 80860 <br />Golder Associates Inc. <br />44 Union Boulevard, Suite 300 <br />Lakewood, CO 80228 <br />(303) 980-0450 <br />(303) 985-2080 <br />Golder Project No.: 003-2203 <br />RE: Summary No. 5: October 27 through November 9, 2002 <br />Cresson Project Phase IVh, c Construction Quality Assurance <br />Dear Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase IVb and c Construction <br />Quality Assurance (CQA) services performed for the Cresson Project during the period of October 27x' <br />through November 9a', 2002. <br />The weather during this reporting period was clear to cloudy. Approximate daytime low <br />temperatures ranged from 8° F to 33° F, and hi~hs ranged from 32° F to 53° F. Snow was recorded <br />on October 27x', 28`s, and 29'a and November 5 and 9a', 2002. Weather observations were made on <br />all fourteen days of this fourteen day reporting period. <br />Construction Synopsis <br />Ames Construction Inc. (Ames) of Aurora, Colorado is the earthworks contractor for the Phase IVb and <br />c construction. Ames conducted Phase IVb and c construction activities on all fourteen days of this <br />fourteen day reporting period (October 2T" through November 9'~. <br />Phase IVb <br />Poly-Flex conducted repairs on previously deployed geomembrane. Destructive extrusion seam <br />samples DX-14 through DX-16 were marked, removed, and tested. <br />Ames continued placement of Structural Fill (SF) in the Phase IVb azea. Ames placed SF above the <br />Phase IVb sump. Ames also continued slope recontouring in the Phase IVb azea on Substation Hill, on <br />the South facing slope of Phase IVb below the 9624 road, and at the PSSA West end berm. Slope <br />recontouring work on the Phase III ore slope and the PSSA West end berm was essentially completed <br />
The URL can be used to link to this page
Your browser does not support the video tag.