My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE26725
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE26725
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:34:34 PM
Creation date
11/21/2007 11:24:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Enforcement
Doc Date
5/20/1996
Doc Name
SENECA II-W MINE NOV C-95-023
From
SENECA
To
DMG
Violation No.
CV1995023
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Michael Long <br />May 16, 1995 <br />Page 2 <br />Division of Minerals and Geology inspection comments <br />The following are comments about the B pit, i.e. northwest A pit, from the backfilling and <br />grading sections of inspection reports: <br />Inspection date Inspector Comments <br />9-7-94 SLB no problems noted <br />9-1494 ESC no problems noted <br />10-28-94 SLB Reclamation operations were nearly complctc on the northwestern <br /> portion of the A pit. The final highwall had bccn blasted, graded, and <br /> covered with topsoil....The reclaimed topography appcarcd to be in <br /> compliance with approved post mine contours and blcndcd well with <br /> existing slopes. <br />11-8-94 ESC Northwest portion of the A pit appears to be complete and blends in <br /> well with the existing topography. <br />t-4-95 SLB Final grading was complete on the upper 1/3 of the pit. <br />3-31-95 DTM meastued final drainage--no specific enforcement actions <br />6.21-95 WHE backfilled area settled.. section 006-NEI appears as a gully 24 to 36 <br /> inches deep and needs maintenance. <br />9-1495 LPR ...it appears impacts to undisturbed areas could be minimized by <br /> continuing to direct runoff down the road ditch and down the rock <br /> lined channel on the reclaimed B pit. <br />9-27-95 SLB ...one other item of concern is the constmcted channel which runs <br />roughly parallel to the reclaimed highwall....the operator should look <br />into this discrepancy, and inform the division... <br />NOV issued 10-16-95 <br />10-19-95 ESC ...no erosion features were noted in this backfi0ed area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.