My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV17328
DRMS
>
Back File Migration
>
Revision
>
REV17328
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:28:54 AM
Creation date
11/21/2007 11:24:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
4/10/2007
Doc Name
Response to DRMS 2/9 Letter
From
Western Fuels-Colorado, LLC
To
DRMS
Type & Sequence
TR54
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. I don't know what you want to do about haul distance since the area is <br />the foot print of a topsoil pile. <br />4. There will be zero acres requested for Phase 2 release at this time so go <br />ahead and include the cost in TR54. <br />5. Be sure to revise the struck and heap volume of 24 8 34 LCY for a 631 <br />scraper <br />Task 037 <br />1. New acreage of 70.31 acres at 18inches have been calculated as can be <br />seen on Map 3.02.2~A. <br />2. Phase 2 bond release will be request so the cost should not go into the <br />totals. <br />3. Same general comment about recalculated scraper volumes and yards <br />moved as I stated in Task 032 above. <br />4. I agree, this task shall be addressed in Technical Revision 55. <br />Task 038 <br />1. New acreage of 8.38 acres at 9inches have been calculated as can be <br />seen on Map 3.02.2.6A. <br />2. Phase 2 bond release will be request so the cost should not go into the <br />totals. <br />3. Same general comment about recalculated scraper volumes and yards <br />moved as I stated in Task 032 above. <br />4. I agree, this task shall be addressed in Technical Revision 55 <br />Task 039 <br />1. New acreage of 33.54 acres at 27inch have been calculated as can be <br />seen on Map 3.02.2.6A. <br />2. Phase 2 bond release will be request so the cost should not go into the <br />totals. <br />3. Same general comment about recalculated scraper volumes and yards <br />moved as I stated in Task 032 above. <br />4. I agree, this task shall be addressed in Technical Revision 55 <br />Task 040 <br />1. Task 040 acreage has been incorporated into Task 037. <br />Task 041 <br />1. Task 041 and 042 have been combined. <br />F:\Eng\DATA\WP\revisions\TR54.wpd Page 8 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.