My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV17328
DRMS
>
Back File Migration
>
Revision
>
REV17328
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:28:54 AM
Creation date
11/21/2007 11:24:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
4/10/2007
Doc Name
Response to DRMS 2/9 Letter
From
Western Fuels-Colorado, LLC
To
DRMS
Type & Sequence
TR54
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. New acreage of 7.54 acres at 45inches have been calculated as can be <br />seen on Map 3.02.2~A. <br />2. Phase 2 bond release will be request so the cost should not go into the <br />totals. <br />3. Same general comment about recalculated scraper volumes and yards <br />moved as I stated in Task 032 above. <br />4. I agree, this task shall be addressed in Technical Revision 55. <br />Task 034 <br />1. New acreage of 1.38 acres at 36inch depth have been calculated as can <br />be seen on Map 3.02.2-6A. <br />2. Phase 2 bond release will be request so the cost should not go into the <br />totals. <br />3. Same general comment about recalculated scraper volumes and yards <br />moved as I stated in Task 032 above. <br />4. I agree, this task shall be addressed in Technical Revision 55. <br />Task 035 <br />1. New acreage of 9.04 acres at 12inches have been calculated as can be <br />seen on Map 3.02.2~A. <br />2. Phase 2 bond release will be request so the cost should not go into the <br />totals. <br />3. Same general comment about recalculated scraper volumes and yards <br />moved as I stated in Task 032 above. <br />4. I agree, this task shall be addressed in Technical Revision 55. <br />Task 036 <br />1. New acreage of 28.39 acres at 12inches have been calculated as can be <br />seen on Map 3.02.2~A. <br />2. Phase 2 bond release will be request so the cost should not go into the <br />totals. <br />3. Same general comment about recalculated scraper volumes and yards <br />moved as I stated in Task 032 above. <br />4. I agree, this task shall be addressed in Technical Revision 55. <br />Task 036A <br />1. This is a new task. This is the portion of Task036 that does not have <br />adequate vegetation for Phase 2 release. See Map 3.02.2-6A for <br />location. <br />2. Acreage is 4.63acres at 12inch thick. <br />F:\Eng\DATA\WP\revisions\TR54.wpd Page 7 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.