My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV17328
DRMS
>
Back File Migration
>
Revision
>
REV17328
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:28:54 AM
Creation date
11/21/2007 11:24:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
4/10/2007
Doc Name
Response to DRMS 2/9 Letter
From
Western Fuels-Colorado, LLC
To
DRMS
Type & Sequence
TR54
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mike Boulay Description Location of <br />Letter Question Answer <br /> <br />4 DRMS usually includes WFC policy for determining sediment pond <br /> costs for sediment pond cleanout timing is to use quarterly pond <br />(09 February 07 letter) cleanout during the ten inspection observation and/or annual pond <br /> year liability volume surveys. Volume surveys are compared <br /> period....Please provide to the approved SEDCAD model and if <br /> information on how often necessary, the SECDAD model is rerun to <br /> WFC is cleaning all of the assure water quality parameters are being met. <br /> ponds on site. As you know, Pond 007 is the only active pond <br /> that receives and discharges mine water on a <br /> regular bases. The recent 007 survey shows <br /> that only 1 ac-ft out of 43 ac-ft have been <br /> consumed by sediment. Pond 008,009,012,and <br /> 014 see infrequent runoff with sediment load. <br /> To date, no pond has needed sediment to be <br /> removed. <br />5 WFC porvided a fence I will take a look at the post mine contours. <br /> diagram for Cut 88 (Map Mining and reclamation is a continual changing <br />(09 February letter) 3.02.2-3) showing dynamic situation and parameters can and do <br /> reclamation of the final pit change frequently. <br /> at a worst case <br /> scenario......Please review <br /> the currently approved <br /> post-mining contours for <br /> the site and determine if <br /> those contours can <br /> realistically be achieved. <br />Irrigated and Dryland Pasture The areas that WFC will be studying for Phase 2 and subsequently topsoil and <br />fields under consideration for vegetation bond release can be seen on Map 3.02.2-6A. <br />Phase 2 Bond Release . <br />BB Road Detour Reclamation Plan, Profile and Cross Sections of BB Road Detour can be seen on Map <br />Plan 3.02.2-,8 and 9. Volume calculations can be seen on Map 3.02.2-8 and 9. <br />CCC Pipeline Relocation The CCC Pipeline Relocation to its permanent location has been completed <br />Costing and a letter of completion from the Colorado Cooperative Company will be <br /> forwarded to DRMS. <br />W FC's Task 001 to 100 See following pages <br />comments <br />F:\Eng\DATA\WPVevisions\TR54.wpd Page 2 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.