My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-08-23_REVISION - M1983033
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983033
>
2002-08-23_REVISION - M1983033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:49 PM
Creation date
11/21/2007 11:23:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983033
IBM Index Class Name
Revision
Doc Date
8/23/2002
Doc Name
Replacement Pages
From
Environment Inc
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION PLAN EXHIBIT E <br />~®np~u~ zooz <br />In this amendment the method of mining and reclamation <br />remain unchanged from what is now approved, only the size of the <br />mine will change. Grading will be such that drainage of the <br />interior area will be toward the existing natural drainage course <br />that is at the western mine entrance. <br />This proposed change increases the amount of revegetation <br />that will be done on the mine. Under the old plan only the flat <br />benches around the mine needed to be reclaimed, and the floor <br />area is designated as commercial area. Under the new plan this <br />does on change on the existing mine area. what does change is <br />that the north face will be removed and a long 3h to lv slope <br />will be created along the north side of the new area. There will <br />still be near vertical benches in the new area, they will only <br />exist as an extension of the east face, around the northwest <br />corner of the new area and along the west side of the mine. <br />All of the mined area has been combined into Phase I to <br />create a single mining and reclamation stage/phase. Reclamation <br />for the existing areas of Phase I remains unchanged from the <br />previously approved plan. The current methods and plan to <br />reclaim the area will be used on the new area with a minor change <br />in the tree planting scheme. <br />In the three areas where vertical benches will be left, the <br />west side, and along the ease and south side of the existing <br />permit area, the overall bench slopes (horizontal to vertical) <br />may vary between Oh:ly and l.lh:ly. The Current Conditions Map <br />shows that existing natural slopes are, about 0.8h:1v in certain <br />places along the south side of the property, and approximately <br />how the site looks at this time. The operator expects the slope <br />of the mine floor when finished, to be a very gentle, one or two <br />percent from east to west, thereby establishing positive drain- <br />age. On the north slope area where the newly mined slope blend <br />14 (Revised 8/19/02) <br />
The URL can be used to link to this page
Your browser does not support the video tag.