Laserfiche WebLink
<br />S 7-9~: Spring 7-9 is located outside the area of any potential mine impacts given <br />mine development to date. Zhis site was observed July (dry) and A!~;,~t <br />(dry) 1992. No water quality sample was obtained as no flow was observed. <br />No further monitori.rg efforts were expended at this spring as it was <br />presumed conditions remained largely unchanged with no measurable flows <br />oaw.-ring throughout the remainder of the year. Ztte flew magnitudes <br />historically associated with this feature are non-measurable in all but <br />two inST.ances and further monitoring of a feature this insignificant seems <br />inappropriate aryl unary. <br />S 7-10z: Spring 7-10 is located outside the area of any potential mine impacts <br />given mine development to date. This site was flowing in July (0.5 gpm) <br />aryl August (rro measurable flow) 1992. No water quality sample was <br />obtained as a sufficient database Pxists to characterize pre-mini.,~r water <br />quality at this site. The flow maasurement for July 10.0011 cfsl was <br />omitted frwn the AHR. No further monitoring efforts were expended at this <br />spring as it was presumed conditions remained largely unchanged with no <br />mPaa„rable flows oaurring thrax~rout the remairxier of the year. <br />S 8-5Z: Spring 8-5 is located outsirdr~e~ t~he area of any potential mine impacts given <br />mine development to date. 1111) site was observed in July (0.5 gpm) aryl <br />August (no measurable flow) 1992. No water quality sample was obtains3 as <br />a sufficient database exists to characterize pre-mining water quality at <br />this site. No further monitoring efforts were expesided at this spring as <br />it was prestaned conditions remained largely unchanged with no measurable <br />flows occurring throughout the remainder of the year aryl nro mining with <br />the potential to create impacts at this site has occurred. <br />BORF~,FB <br />B-1~: All of the "B" series wells were installed and monitored to assess and <br />ensure slope stability in and around the Fast Mine facilities area. Well <br />B-1 has been dry since it was installed in 1982. Continued monthly <br />monitoring of this well does not produce data of value aryl should be <br />disoorrtinued. Well B-1 was measured and drv in December. 1992. This data <br />was omitted from the AHR. <br />B-2': Well B-2 exhibits measurable water levels only when runoff through the <br />diversion channel in which it is installed is occurring. Invariably, when <br />the channel dries out, the well dries out as well. Continued monitoring <br />of this well does not provide useful information and should be <br />discontinued. Well B-2 was measured and drv in December. 1992. This data <br />was omitted from the AHR. <br />B-3': Well B-3 has been dry since its casing failed in the Spring of 1988. <br />Continued monthly monitoring of this well does not produce data of value <br />and should be discontinued. Well B-3 was measured aryl dry in December. <br />1992. This data was omitted from the AHR. <br />B-4: Well B-4 provides consistent water level mPac1„-wmPnts and monitoring of <br />this site should be continued although sufficient data has been collected <br />to warrant less frequent monitoring. <br />B-5': Well B-5 has been dry since it was installed in 1982. Continued monthly <br />11 <br />