My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-03-31_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
1999-03-31_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2021 7:08:01 PM
Creation date
11/21/2007 11:21:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Revision
Doc Date
3/31/1999
Doc Name
HENDERSON MINE AND MILL PN M-77-342 TR AFFECTED LAND EXCHANGE
From
SHAFER AND ASSOCIATES INC
To
DMG
Type & Sequence
TR7
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. . • (Page 4) • <br /> MINE ID 0 OR PROSPECTING ID N M-77-342 <br /> INSPECTION DATE 8/6/98 INSPECTOR'S INITIALS ACS <br /> • <br /> until replacement on the regraded, disturbed area. Relocations of topsoil stockpiles on <br /> the affected land require Board or Office approval. Approval in most cases would be <br /> granted by way of a technical revision. ' pla <br /> 2. Incorporate the installat/ of an erosion resistant 4-inch durable rock <br /> cover on the slope between Stations ( and 86 into the reclamation permit. This <br /> installation is a requirement of the U.S. Forest Service. COA4 n <br /> 3. Incorporate the use of shot crete to stabilize rock cuts into the <br /> reclamation permit. Z2.; l- <br /> 4. Include the access road into bents 3 and 4 at Con-9 into the area of <br /> affected land. In accordance with Division policy, this may be done under a technical <br /> revision if an equal amount of undisturbed affected land is deleted from the area of <br /> affected land, and if the same public notice procedures as required for an amendment <br /> application are adhered to. Also, the Operator must waive the right to a 30 day decision <br /> on the technical revision to allow for the same public comment period that would apply to <br /> an amendment application, and the Operator must agree that the application will have to <br /> become an amendment in the event any adverse public comment is received. An instruction <br /> sheet for this type of technical Revision was provided to the Operator previously. If <br /> another copy of these instructions is required, the Division should be contacted. <br /> Cc: Carl Mount, DMG <br /> I & E Contact Address <br /> ❑ CE <br /> NAME Bryce ROmia ❑ BL <br /> OPERATOR Climax Molybdenum Comoany ❑ FS <br /> STREET Climax Mine ❑ HW <br /> CITY/STATE/ZIP Climax CO 80429 ❑ HMWMD (CH) <br /> ❑ SE <br /> ❑ WQCD (CH) <br /> ❑ OTHER <br />
The URL can be used to link to this page
Your browser does not support the video tag.