My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE26448
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE26448
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:34:23 PM
Creation date
11/21/2007 11:19:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
Enforcement
Doc Date
6/30/1997
Doc Name
Request for Abatement Extensions
From
THE PITTSBURG & MIDWAY COAL MINING CO
To
DMG
Violation No.
CV1997007
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
;,..., <br />perforned. As the Division is awaze, several rock structures at the mine are in need of <br />maintenance. P&M requests the extension to enable all materials and maintenance work <br />for this abatement step and abatement step 26. to be performed concurrently. <br />2b. Repair Rip rap and liner in Final Moffat Channel; abatement to be completed by 18 July <br />1997. <br />P&M requests that the abatement step required be extended to September 18,1997. The <br />extension is needed to allow P&M time to secure materials and a contractor to complete <br />the necessary work. <br />2c. Spray thistle that has grown up on sediment deposited in undisturbed areas affected by <br />Moffat Pond short-circuit; abatement to be completed-by 1 I July 1997. <br />P&M requests that the abatement step required be extended to July 25, 1997. The <br />extension is needed to allow P&M's contractor time to mobilize and perform the work. <br />3b. Spray thistle that has grown up on sediment deposited in undisturbed azeas from erosion <br />of reclaimed azea; abatement to be completed by 11 July 1997. <br />P&M requests that the abatement step required be extended to July 25, 1997. The <br />extension is needed to allow P&M's contractor time to mobilize and perform the work. <br />Should the Division require clarification pertaining to the information provided by P&M, please <br />contact me at your eazliest convenience. <br />Sincerely, <br />Brian D. Gontazek <br />Senior Environmental Engineer <br />cc: Edna Mine <br />
The URL can be used to link to this page
Your browser does not support the video tag.