Laserfiche WebLink
N "~ <br />Y.T <br />P~~ ~~ <br />III IIIIIIIII IIII III <br />999 <br />The Pittsburg ~ Midway Coal Mining Co. <br />A Chevron Company <br />6400 Soulh Fiddler's Green Circle, Englewood, CO80111 • Phone (30319343600 <br />P~C;EIVED <br /><<•ra <br />JUN 3 0 1997 <br />June 27. 1997 <br />pivision ur ivunem~s ~ geology <br />Permit C-80-001 <br />Notice of Violation C-97-007 <br />Mr. James R. Burnell <br />Colorado Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Dear Mr. Burnell: <br />P&M hereby requests an extension to some of the abatement steps required by the above <br />mentioned Notice of Violation. <br />Abatement steps for which an extension is requested: <br />1 b. Permanent measures should be taken through submission of a permit revision to assure all <br />road drainage is effectively controlled; Submit complete application for revision by 10 <br />July 1997. <br />P&M understands [he necessity of the requirement. However, a technical revision <br />pertaining to the roadway is pending. P&M requests that the information required by the <br />abatement action be incorporated into pending Technical Revision 35 in order for the <br />language describing the permanent measures for controlling drainage to be consistent <br />with the pending language. P&M requests that the abatement period for this step be <br />extended until July 31, 1997. <br />2a. Clean out sediment from north end of Moffat Pond and the outlets of North Diversion <br />Ditch and Final Moffat Drainage Channel; abatement to be completed by 18 July 1997. <br />P&M requests that the abatement step required be extended to September 18, 1997. The <br />extension is needed to allow P&M time to secure a contractor and have the work <br />