Laserfiche WebLink
<br />Steve Renner <br />2 <br />August 31, 1992 <br />level of the primary spillway inlet. Pond 15-P2 was discharging at the rate of 1 /2 gpm, <br />while the other three were not discharging at all. The discharge from 15-P2 was sampled, <br />and we are awaiting the results. The abatement date for NOV C-92-019 is September 14, <br />1992. The abatement dates for NOV C-92-020 and C-92-021 have been extended to <br />September 4, 1992. <br />Trinidad Basin Mine <br />Date of <br />Inspection <br />5/1!91 <br />5/9/91 <br />6/1 1 /91 <br />6/20/91 <br />7/15/91 <br />7/22/91 <br />7131 /91 <br />9/12/91 <br />9/24/91 <br />10/21 /91 <br />10/23(91 <br />12/16/91 <br />1 /28/92 <br />2!10!92 <br />3/24/92 <br />4/21 /92 <br />4/28/92 <br />5/27/92 <br />6/23/92 <br />6129!92 <br />7128192 <br />8/18(92 <br />NOVs Date of Abatement Date <br />Type Issued Service Dates Terminated <br />CC <br />CC <br />CP <br />CP <br />CP <br />CP <br />CP <br />CC <br />CP <br />CP <br />CC <br />CP <br />CC <br />CP <br />CP <br />CC <br />CC <br />CP <br />CP <br />CP <br />CC <br />CP <br />C-91-009 7/26/91 9/10/91 <br />C-92-013 7/16/92 8/15/92, <br /> 9/1 i92 <br />C-92-014 7/16/92 8/1/92 <br />C-92-019 8/14/92 9/14/92 <br />C-92-020 8!14/92 8/24192 <br />C-92-021 8/14/92 8/24/92 <br />9/13/91 <br />JJD/yjb <br />