My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE26256
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE26256
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:34:16 PM
Creation date
11/21/2007 11:15:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Enforcement
Doc Date
8/5/1994
Doc Name
PERMIT C-81-019 COLOWYO COAL CO LP NOV C-94-015 ADDITIONAL INFORMATION & REQUEST FOR VACATION OF NOV
From
COLOWYO COAL CO LP
To
DMG
Violation No.
CV1994015
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENGINEER CERTIFICATION <br />I, Stephen R. Hinkemeyer, being a registered professional engineer <br />in the State of Colorado do hereby certify that based on my <br />professional expertise, and the information provided to me by Mr. <br />Juan Garcia regarding theoretical hydrological modeling assumptions <br />arrived at through negotiations with the Colorado Division of <br />Minerals and Geology, the following information has been reviewed <br />by me and true and correct to the best of my knowledge. <br />1) The map titled "INITIAL WEST PIT STRIP AREA - INTERIM <br />DRAINAGE FLOW" approximates the hydrologic control as of <br />July 18, 1994. <br />2) The table titled "COLOWYO COAL COMPANY, INITIAL WEST PIT <br />BOXCUT TOPSOIL STRIPPING, INITIAL STRIPPING AREA DRAINAGE <br />ANALYSIS" approximates the hydrologic control as of July <br />18, 1994. <br />3) The drainage structure #1 West Pit Sediment Pond is <br />adequate to contain the predicted runoff or sediment <br />resulting from a 10-year, 24 hour precipitation event <br />occurring in drainage area #1. <br />4) The drainage structure #2 comprised of the in-pit initial <br />boxcut is adequate to contain the predicted runoff or <br />sediment resulting from a 10-year, 24 hour precipitation <br />event occurring in drainage area #2. <br />5) The drainage structure #3 comprised of an additional in- <br />pit control structure is adequate to contain the <br />predicted runoff or sediment resulting from a l0-year, 24 <br />hour precipitation event occurring in drainage area #3. <br />°~,~`p~Stephen R. Hin <br />25436 C~.~'E. No. 25436 <br />J`l,, zz 15~Y <br />Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.