Laserfiche WebLink
.COAL -% = <br />\`pp~e. COMPANY L.P. --~ ~ <br />_`Op~f PRODD~E~E~i <br />Confirmation of fax sent on July 22, 1994 <br />Ms. Susan Burgmaier <br />Environmental Protection Specialist <br />Colorado Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />5731 State Highway 13 <br />Meeker, Colorado 81641 <br />1303) 824-4457 - <br />July 22, 1994 <br />RE: Permit C-81-019, Colowyo Coal Company L.P. <br />NOV C-94-015 <br />Requirements for Abatement of Violation <br />Dear Ms. Burgmaier: <br />As detailed in your letter faxed July 18, 1994, Colowyo was to <br />perform two requirements prior to being allowed to continue topsoil <br />stripping operations in the West Pit Area. The two day abatement time <br />frame will star[ once the hard copy NOV is received at Colowyo. On July <br />22, 1994, the hard copy NOV was received. <br />Requirement 1 requests that adequate structures be constructed. <br />Structure #1, West Pit Pond, was enlarged from its initial capacity to <br />its present 12.8 acre foot capacity with this capacity in place on June <br />28, 1994. Structure #2, Initial Boxcut, was further enlarged from its <br />initial (unsurveyed) capacity to its present 50.3 acre foot capacity with <br />this capacity in place on July 18, 1994. Structure #3, In Pit Control <br />Structure, was also further enlarged from its initial (unsurveyed) <br />capacity to its present 5.7 acre foot capacity with this capacity also <br />in place on July 18, 1994. <br />Requirement 2 requests certifications by an engineei which are <br />enclosed. <br />Colowyo trusts that these responses are adequate for complete <br />abatement of this NOV. Please call if questions arise. <br />Sincerely, <br />~~.~m/ ~%r~~ r <br />Juan Garcia <br />Hydrologist/Environmental <br />Engineer <br />btb <br />Enclosures <br />By Federal E.+cpress <br />xc: R. G. Atkinson <br />Central Files <br />