My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-06-10_INSPECTION - C1981038
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981038
>
2003-06-10_INSPECTION - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2022 11:05:57 AM
Creation date
11/21/2007 11:11:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Inspection
Doc Date
6/10/2003
Doc Name
INSPECTION REPORT
Type & Sequence
SL2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 1 Mine C-81-038 <br />Summary Sheets <br />BRL DMG Done Partial Comments <br />Task Task Reclamation Task bescri lion Y N <br />74 92 -Backfill and Regrade Timber Storage Pond X <br />76 93 -Backfill and Regrade Coal Stockpile Pond X <br />111 95 -Backfill and Re ade Pond W- 1 g <br />112 96 -Backfill and Regrade Pond W-2 X <br />78 100 -Replace Topsoil from Stockpile to Waste Disposal Area Will Be Subject of Later Inspection <br />79a 101 -Move Fill Topsoil Pile into Stockpiled Area X <br />79b 102 -Replace Topsoil from Stockpile to OVWM X <br />79c 103 -Replace Topsoil from Stockpile to Replaced Fill X <br />80 104 -Replace Topsoil from Stockpile to OVWM Vent Shaft Access X <br />81 105 -Haul Stevens Gulch Topsoil to OVM X <br /> 106 -Redistribute Topsoil at Truck Dump Station X <br />83 107 -Replace Topsoil from Stockpile to OVM Main Diversion Ditch X <br />84 108 -Replace Topsoil from Stockpile to Remaining Mine Site X <br />92 109 -Replace Topsoil from OV WM Slide Area Task Done But Not Part of Phase One Bond Release <br />124 110 -Replace Topsoil from Stockpile to TR-38 Drill Pad X <br />125 111 -Replace Topsoil from Stockpile to TR-38 Light Use Road X <br />113 112 -Replace Topsoil from Stockpile to Pond W- 1 X <br />114 113 -Replace Topsoil from Stockpile to Pond W-2 X <br />85a 118 -Seal OVWM Portals and Vent Shafts X West Mine Vent Shaft Filled But Not Capped <br />85b 119 -Seal OVM Portals and Shafts X East Mine Vent Shafts Filled But Not Capped <br />85c 120 -Seal Rock Slope Entty Structures Bond Reduction -Rock Slope Tunnels Never Constructed <br />,d,121 125 -Plug and Seal All Boreholes X <br />87a 130 -Revegetate OVM X <br />87b 131 -Revegetate OV WM X Seeded But Not Part of Phase One Bond Release <br /> 132 -Revegetate Remainder of Mine Site X <br />87d 133 -Revegetate Narrowed Haul Road Outslope X <br />88 137 -Demolish and Remove All Structures Refer To Demolition Sheets <br />88 138 -Demolish and Remove All Structures Refer To Demolition Sheets <br />88 139 -Demolish and Remove All Structures Refer To Demolition Sheets <br />88 140 -Demolish and Remove All Structuros Refer To Demolition Sheets <br />88 141 -Demolish and Remove All Structures Refer To Demolition Sheets <br />Summary Sheets Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.