My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-06-10_INSPECTION - C1981038
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981038
>
2003-06-10_INSPECTION - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2022 11:05:57 AM
Creation date
11/21/2007 11:11:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Inspection
Doc Date
6/10/2003
Doc Name
INSPECTION REPORT
Type & Sequence
SL2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 1 Mine C-81-038 <br />Fi immarv Rhoats <br />BRL DMG Done Partial Comments <br />Task Task Reclamation Task Descriution Y_ N <br />40 49 -Regrade OVWM Light Access Road X <br />41 50 -Regrade Timber Storage Access Road X <br />42 51 -Reestablish East Roatcap Creek Road X Total Bond Can Be Released <br />43 52 -Regrade Old Waste Disposal Road X <br />44 53 -Regrade West Ridge Disposal Area X Bond Can Be Released For All But North Area <br />47 54 -Finish Grade Lower Waste Disposal Road X <br />48 55 -Rip Outer 22'of Asphalt Haul Road X <br />49 56 -Haul Asphalt from Haul Road to Portal Bench Zone 4-C X <br />52 57 -Rip Outslope of Haul Road X <br />53 58 -Excavate Haul Road Outslope and Place at Toe X <br />123 59 -Regrade, TR-38 Light Use Road X <br />45 63 -Finish Grade All Reclamation Zones (1-4) X <br />50 64 -Finish Grade Upper Waste Disposal Road X <br />51 65 -Finish Grade Crushing and Screening Road X <br />55 66 -Finish Grade OVWM X Bond Can Be Released For Upper Area <br />57 68 "-Finish Grade Waste Disposal Area X Bond Can Be Released For All But North Area <br />58 69 -Finish Grade ROM Storage Area X <br />54 74 "-Recut Haul Road Ditches X <br />59 75 -Construct 2730' of 3' Ditches X <br />60 76 -Construct 4340' of 12' Ditches X <br />61 77 -Construct OV WM Diversion for Surface Drainage Bond Reduction - No Diversion Required or Needed <br />62 78 -Backfill OVM Pipeline Removal Trench X <br />64 79 -Establish Irrigation Ditch at Storage and Loadout X <br />63a 81 -Riprap Placement X <br />67 85 -Backfill and Regrade Pond 1 X <br />68 86 -Backfill and Regrade Pond 2 X <br />69 87 -Backfill and Regrade Pond 3 X <br />70 88 -Backfill and Regrade Pond 4 X <br />71 89 -Remove Concrete Pond Dams X <br />72 90 -Backfill and Regrade OVWM Pond X Total Bond Can Be Released <br />73 91 -Backfill and Re ade Waste Pile Pond X <br />Summary Sheets Nage Z of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.