My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-06-10_INSPECTION - C1981038
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981038
>
2003-06-10_INSPECTION - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2022 11:05:57 AM
Creation date
11/21/2007 11:11:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Inspection
Doc Date
6/10/2003
Doc Name
INSPECTION REPORT
Type & Sequence
SL2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JII. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the inspection <br />and the facts or evidence supporting the enforcement action. . <br />East Mine -Transfer Bench <br />B1tL requested bond release for structural demolition, with the exception of concrete <br />removal, for the facility structures at the transfer bench level. The transfer tower #1 <br />superstructure and the overland conveyor were demolished and either salvaged or buried <br />on site in acounty-approved pit on the shop benchror on the office level bench. One <br />concrete floor and one concrete footing remain. The guard rail and fire hydrant also. <br />remain. <br />East Mine -Substation Bench <br />BRL did not request bond release for any reclamation work at this site. The substation <br />superstructure, concrete slabs and walls and the fence remain. <br />East Mine -Office Bench <br />B1tL requested bond release for structural demolition, removal of belt structures, removal <br />of fuel storage barrels and sealing of portals at the office level. Concrete items were not <br />included in the bond release request. The superstructures for the bath house and fuel <br />station, the steel master control center and the on-grade and overland conveyors were <br />demolished. Some of this superstructure material was removed offsite for salvage and <br />some was buried in two county-approved pits, now covered with soil, located on the <br />office bench. Concrete footings and floors, the solid waste storage bin, the concrete block <br />motor control.building and the concrete block rock dust building remain on site. The <br />concrete floor and footings of the fuel station remain, although the various tanks were <br />removed. At the time of the inspection, the operator was removing the last of the oil from <br />this facility. The three portal edits were backfilled with 50 feet ofnon-combustible <br />material, compacted against a concrete block wall seal placed to the reaz. <br />East Mine -Fan Bench <br />BRL requested bond release for the final sealing of the two ventilation shafts on the fan <br />bench level. The shafts have been filled but have not been capped. No bond release for <br />stnictural demolition at this level was requested by B1tL. <br />East Mine -Miscellaneous <br />One of the fire hydrants was dismantled and removed offsite. Six of the original seven <br />fire hydrants remain to be dismantled, as well as the road guardrails. The operator did not <br />