My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV15968
DRMS
>
Back File Migration
>
Revision
>
REV15968
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:27:21 AM
Creation date
11/21/2007 11:10:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Revision
Doc Date
1/12/2007
Doc Name
2nd Response Letter
From
Seneca Coal Company
To
DRMS
Type & Sequence
TR55
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SENECA II-W MINE <br />PERMIT C-82-057 <br />INSERTION INSTRUCTIONS <br />TECHNICAL REVISION NO. 55 (TR-55) <br />January 11, 2007 <br />Permit Index, Vol. 1 <br />• List of Exhibits -replace pages 5 and 6 <br />Tab 13, Facilities, Vol. 8 <br />Attachment 13-7, Culvert Calculations -replace Table 13-7-1 <br />Attachment 13-7, Culvert Calculations -replace SEDCAD modeling demonstration for Culvert PM-10 <br />(pages 13-7-227 through 13-7-234) <br />Attachment 13-7, Culvert Calculations -replace SEDCAD modeling demonstration for Culvert PM-ll <br />(pages 13-7-235 through 13-7-242) <br />Tab 20. BacldYll and Grading, Vol. Z3 <br />• Table of Contents -replace existing TOC <br />• Text -replace pages 13 (Table 20-2, Postmine Drainage Channel Summary) and 14 <br />• Attachment 20-B, 2006 Neckpit Slide Remediation Plan -insert new attachment <br />• Attachment 20-1, Postmining Drainage Channel Design -replace Attachment 20-1 slipsheet <br />• Attachment 20.1, Postrnining Drainage Channel Design -replace Figure 20.1.2, Posttnine Channel <br />Designs for South Area <br />• Attachment 20-1, Postrnining Drainage Channel Design -replace pages 20-1-792 through 20-1-207A <br />(SEDCAD modeling demonstration Eor Posttnine Channels 4, 4A, 4B and 4C) <br />• Attachment 20-1, Posttnine Drainage Channel Design -remove pages 20-1-227 through 20-1-233 (this <br />SEDCAD modeling demonstration fox Stock Pond T-27 is a duplicate to that Eound on pages 13-11A-27 <br />Through 13-11A-36) <br />e Attachment 20-1, Postmining Drainage Channel Design -insert pages 20-1-227 through 20-1-236 <br />(SEDCAD modeling demonstration for Postmine Channel 4D) <br />• Exhibit 20-2, Backfill and Grading Plan -replace existing exhibit <br />Tab 21, Minesoil Reconstruction, Vol. 13 <br />• Move Tab 21 in its entirety from Vol. 13 to new Vol. 13A <br />Tab 22, Revegetation Plan, Vol. ]3 <br />• Move Tab 22 in its entirety from Vol. 13 to new Vol. 13A <br />Tab 21, Minesoil Reconstruction, Vol. 13A <br />• Insert existing Tab 21 in its entirety into new Vol. 13A <br />Tab 22, Revegetation Plan, Vol. 13A <br />• Insert existing Tab 22 in its entirety into new Vol. 13A <br />
The URL can be used to link to this page
Your browser does not support the video tag.