Laserfiche WebLink
<br /> <br />Mr. Beattie -2- December 1, 1987 <br />B. Engineering/Bid Spec./Contract Document Prey ration Fee s_ <br />2% o Contract Amount erect costs p us over ea ~ <br />profit) E 30,281.29 <br />C. CMLRD Project Mana ement Ex enses - 520/hr x re man hours <br />manpower costs for contract issuance 8 construction oversite) 1,600.00 <br />TOTAL INDIRECT RECLAMATION COSTS (Items A - C) E 193,529.67 <br />Total Performance Bond (not including loadout) 1,545,945.60 <br />6D% Release 927,567.36 <br />Bond to be held ~6 <br />The Total Bond of 52,300,000 will be reduced by 5927,567 to a new total of <br />E1,372,433. This figure can be rounded off to 51,372,000. <br />If you have any questions, concerning the bond release, please contact me. <br />Si~ce 1 <br />Karen A. Hellner <br />Reclamation Specialist <br />KAH/vjr <br />Enclosure(s) <br />cc: Rich G, Atkinson <br />3392E <br />