My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV15883
DRMS
>
Back File Migration
>
Revision
>
REV15883
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:27:15 AM
Creation date
11/21/2007 11:09:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980003
IBM Index Class Name
Revision
Doc Date
12/1/1987
Doc Name
HAYDEN GULCH MINE PN C-80-003 PHASE I BOND REDUCTION
From
MLRD
To
MORRISON KNUDSEN CO INC
Type & Sequence
SL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • iii iiiiiiiiiiiiiiii <br />999 <br />STATE OF COLORADO <br />.~ <br />Roy Romer, Governor <br />DEPARTMENT OF NATURAL RESOURCES <br />MINED LAND RECLAMATION DIVISION <br />FRED R. BANTA, Director <br />December 1, 1987 <br />Ms. Gloria Beattie <br />Design Engineer Specialist - Mining Division <br />Morrison-Knudsen Company, Inc. <br />P. O. Box 7808 <br />Boise, Idaho 83729 <br />Re: Hayden Gulch Mine, C-80-003 Phase I Bond Reduction <br />Dear Ms. Beattie: <br />Enclosed are the Division's calculations for the phase I bond release. The <br />figures used were taken from the mid-term review. The Division's estimate <br />differs from the one you submitted in the following three areas; <br />administrative costs, revegetation and topsoil distribution. The Division <br />cannot release the bond for seeding and topsoiling of the facilities area <br />during a phase I bond release. Topsoil replacement and revegetation success <br />will be evaluated during the Phase II release. A detailed breakdown of the <br />administrative costs is included below. <br />Reclamation Cost Estimate - Usina Mid-Term Calculations <br />Backfill Pit <br />Eliminate Temporary O.B. Stockpile <br />Reduce Pit Slopes <br />Topsoil Redistribution <br />Revegetation <br />Total <br />Administrative Costs <br />Indirect Costs <br />A. Overhead and Profit <br />E 54A,156 <br />226,177 <br />60,638 <br />382,316 <br />135,129 <br />~ 1,352,416 <br />1. Public Liability Insurance - 0.82% of direct costs <br />2. Contractor's Performance Bond - 0.80% of direct <br />costs <br />3. Job Superintendant <br />4. Contractor's Profit - 10% of direct costs <br />Subtotal <br />E 11,089.81 <br />10,819.33 <br />4,497.64 <br />135,241.60 <br />Ems' <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203.2273 Tel. (303) 866-3567 <br />
The URL can be used to link to this page
Your browser does not support the video tag.